13/05/2026
Power upgrade underway on this site — converting from single phase to 3 phase supply to support increased demand and set the property up for future expansion. ⚡
This stage included installation of a new meter panel to accommodate the upgraded supply. Alterations to the existing circuits will follow, with loads to be redistributed and balanced across all three phases to ensure the system runs safely and avoids overloading.
Working alongside on this one to deliver the upgrade.
A solid infrastructure upgrade that’ll set the site up properly for what’s ahead. 👌