10/04/2026
JMAG Industries recently supported a client experiencing downtime caused by a failed current shunt assembly within their drive system, with limited availability across the market.
Through our network and technical capability, we were able to identify the correct assembly, source and supply it within tight timeframes, and support the safe return of the truck to service.
In high-demand mining operations, access to critical components like current shunt assemblies is essential to maintaining uptime and reducing disruption.
If your site is facing similar challenges, get in touch with JMAG Industries.
MiningMaintenance HeavyEquipment Uptime Reliability HaulTruck