27/08/2026
Ducted Rough-In 🔧❄️
Another quality rough-in completed for a local builder — this time a 12.5kW Fujitsu ducted air conditioning system paired with a basic Siemens zone control system.
All pipework, drains, cabling and duct connections positioned ready for the next stage of the build, with everything installed neatly and with future access and servicing in mind.
Working closely with builders to make sure the air conditioning rough-in is done right the first time. 👌
Ice Cold Refrigeration & Air Conditioning
📍 Sunshine Coast
❄️ Residential & Commercial Air Conditioning
🔧 Installations • Repairs • Ducted • Split Systems