𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝗦𝗽𝗼𝘁𝗹𝗶𝗴𝗵𝘁: 𝗕𝗿𝗮𝗲𝗺𝗮𝗿 𝗥𝗼𝗼𝗳𝘁𝗼𝗽 𝗣𝗮𝗰𝗸𝗮𝗴𝗲 𝗨𝗻𝗶𝘁𝘀 𝗳𝗼𝗿 𝗙𝗶𝘁𝗻𝗲𝘀𝘀 𝗖𝗲𝗻𝘁𝗿𝗲
A smarter cooling solution for a modern gym 💪❄️
When Clarke's Design & Construct needed a high-performance HVAC solution for a new gym facility, the project presented several challenges; large open training areas, fluctuating occupancy, heat-generating equipment, and limited rooftop space.
Instead of the originally specified three large 195kW units, Braemar Dealer Primo Air Pty Ltd delivered a smarter, modular solution using twelve Braemar 51kW Rooftop Package (RTP) units.
The result?
✔ Flexible zoning so only occupied areas are cooled
✔ Improved rooftop load distribution and airflow
✔ Faster installation with reduced structural requirements
✔ Long-term durability for Queensland’s harsh climate
✔ Estimated 18–25% energy savings from smarter system operation
With a 12–14 week lead time, the system aligned perfectly with the construction program and was delivered on time for the gym’s opening.
Projects like this only succeed through strong collaboration and teamwork across everyone involved.
A big thank you to the builder, installer, engineers, and all project partners who worked together to deliver a smooth and successful outcome.
📄Read the full case study online now: https://www.seeleyinternational.com/hvac-case-study/emf-fitness-centre/