Another quality project completed by FRC LEGO Structures.
This project involved full site preparation, benching, piering, pod steel preparation and concrete works from start to finish.
We began by clearing and preparing the site, removing approximately 340 tonnes of material to achieve required levels across the build platform. Using our 5T Kubota and T650, the team completed all piering, benching and material load out before installing bottom boards ready for plumbing rough-in.
Once plumbing was completed, we returned to finalise pod prep, steel fixing and slab preparation ready for concrete.
Pour day came with plenty of rain, but the team pushed through and delivered a quality finish across the slab.
Another strong effort by the FRC team 👌