30/06/2026
12-Tenancy Warehouse Development in Taree, NSW.
12 warehouse tenancies. No air conditioning. No heating. And a common assumption that no Section J assessment is needed.
The facility comprised 12 individual warehouse tenancies, each with a loading zone. With no conditioned spaces, Parts J1 to J5 of the National Construction Code (NCC) did not apply.
Just because a space is unconditioned doesn't mean you can skip Section J entirely.
This assumption is wrong.
Parts J6 to J9 still apply, covering artificial lighting, power, heated water supply, and energy monitoring. This is a common oversight. Knowing which provisions still apply to unconditioned buildings prevents costly surprises at certification.
We scoped the assessment exclusively to Parts J6 to J9 and verified compliance across every tenancy. A targeted assessment on the applicable provisions was all that was needed
The assessment covered:
1. Lighting calculations completed for all 12 tenancies
2. Wattage verified against NCC limits per space type
3. Timer, switch, and motion detector specifications confirmed
4. Heated water supply and energy monitoring provisions checked
The Result: No design changes or additional measures required.
Right-sized scope. Full compliance. Cleared for certification without delay.
We scope the assessment to what applies, not to what doesn't. Building an unconditioned facility? Unsure which parts of Section J are required? Call 1300 864 944 to find out which provisions apply.
Making compliance simple.