14/12/2025
āĻāĻāĻāĻž āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻĒā§āϰā§āĻā§āϰā§āϏ āĻāĻŋāĻāĻžāĻŦā§ āĻšāĻŋāϏāĻžāĻŦ āĻāϰāĻŦā§āύ?
========================================
āĻāĻāĻāĻž āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻŋāϰ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻā§ āĻŽāĻŋāϞ⧠āĻŽā§āĻ ā§§ā§Ļā§Ļ% āĻšā§, āĻāĻ āϤāĻĨā§āϝ āĻāĻžāύāĻž āĻĨāĻžāĻāϞ⧠āϏāĻšāĻā§āĻ āĻāĻĒāύāĻžāϰ āĻĒā§āϰāĻā§āĻā§āĻā§āϰ āĻĒā§āϰā§āĻā§āϰā§āϏ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āϏā§āĻāĻž āĻāĻžāύāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤ āĻāĻāĻžā§āĻžāĻ āĻĒā§āϰāĻā§āĻā§āĻ āĻļā§āώ āĻšāϤ⧠āĻāϰ⧠āĻāϤ āϏāĻŽā§ āϞāĻžāĻāĻŦā§ āĻāĻŋāĻāĻŦāĻž āĻāϰ⧠āĻāϤ āĻāĻžāĻāĻž āĻāϰāĻ āĻšāϤ⧠āĻĒāĻžāϰ⧠āĻāϤā§āϝāĻžāĻĻāĻŋ āĻŦāĻŋāώ⧠āϏāĻšāĻā§ āĻŦā§āϰ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύāĨ¤
āϧāϰā§āύ āĻāĻĒāύāĻžāϰ āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻāĻžāĻā§āϰ āϏāĻŽā§āĻĒā§āϰā§āĻŖ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻ āϝāĻĻāĻŋ āĻļā§āώ āĻšā§ā§ āĻĨāĻžāĻā§ āϤāĻžāĻšāϞ⧠āĻŦāϞāĻž āϝā§āϤ⧠āĻĒāĻžāϰ⧠āĻŽā§āĻ āĻāĻžāĻā§āϰ ā§Šā§Ģ% āĻļā§āώ āĻšā§ā§āĻā§āĨ¤
āĻāĻŋāĻāĻŦāĻž āϧāϰā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻā§āϰ āĻŽāϧā§āϝ⧠āĻļā§āϧ⧠āĻĢā§āĻāĻŋāĻ āĻ āĻļāϰā§āĻ āĻāϞāĻžāĻŽ āĻāϰ āĻāĻžāĻ āĻļā§āώ āĻšā§ā§āĻā§ āϤāĻžāĻšāϞ⧠āĻŦāϞāϤ⧠āĻĒāĻžāϰā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰāĻžāϞ āĻāĻžāĻā§āϰ ⧍ā§Ļ% āĻļā§āώ āĻšā§ā§āĻā§āĨ¤
āĻāĻāĻžāĻŦā§ āϝā§āĻā§āύ āĻ
āĻāĻļā§āϰ āĻāĻžāĻā§āϰ āĻļā§āώ⧠āĻĒā§āϰā§āĻā§āϰā§āϏ āĻŦā§āϰ āĻāϰāϤ⧠āĻĒāĻžāϰāĻŦā§āύ
āĻŦāĻŋāϏā§āϤāĻžāϰāĻŋāϤāĻ
=======
āĻŦāĻŋāϞā§āĻĄāĻŋāĻ āĻāϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻŋ āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻāĻžāĻ āĻŦāĻšāύ āĻāϰā§:
1. Structure = 35%
2. Brick work = 6%
3. Wood work = 5%
4. Metal work = 2%
5. Plambing and Sanitary = 6%
6. Electrical work = 7%
7. Plaster work = 4%
8. General Floor Tiles work = 6%
9. Toilet & Kit wall Tiles work = 3%
10. Aluminium work = 4%
11. Lift,Generator,Substation=10%
12. Paint work = 3%
13. Others civil work = 6%
14. Utility connection & Bill = 3%
Total = 100%
āĻāĻŦāĻžāϰ āĻāϏā§āύ āϏā§āĻā§āϰāĻžāĻāĻāĻžāϰ āĻ
āĻāĻļā§āϰ āĻ¯ā§ ā§Šā§Ģ% āĻŦāϞāĻž āĻšāϞā§, āϏā§āĻ ā§Šā§Ģ% āĻ
āĻāĻļā§āϰ āĻŽāϧā§āϝ⧠āĻāĻŦāĻžāϰ āĻŦāĻŋāĻāĻŋāύā§āύ āĻ
āĻāĻļā§āϰ āĻā§āύāĻāĻž āĻāϤ āĻĒāĻžāϰā§āϏā§āύā§āĻ āĻĻā§āĻāĻž āϝāĻžāĻāĨ¤
âī¸STRUCTURE : 35%
- Footing & Column Padestal = 20%
- Grade Beam, UGWR top Slab = 5%
- GF Column, Stair etc = 4%
- 1st Floor Slab = 9%
- Typical Floor Column (5x3%) = 15%
- 2nd floor slab to roof slab (5x8) = 40%
- Roof top = 7%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ 35%)
âī¸BRICK WORK : 6%
- GF Brick work = 6%
- 1st floor Brick work = 18%
- 2nd floor Brick work = 18%
- 3rd floor Brick work = 18%
- 4th floor Brick work = 18%
- 5th floor Brick work = 18%
-Roof Top Brick work = 4%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ 6% )
âī¸WOOD WORK : 5%
- Door frame = 40%
- Main Door Shutter = 15%
- Partex Door Shutter = 35%
- Cat Door & Accessories = 10%
TOTAL = 100% (āĻŽā§āĻ āĻ
āĻāĻļā§āϰ ā§Ģ% )
âī¸METAL WORK ~ 2%
- Window grill = 55%
- Verandah Railling = 20%