24/06/2026
40A grid connection. Not enough for a Potain tower crane.
So we brought our own power. ⚡
Deep in the Swiss Alps, Appenzell, below the Säntis, a hydropower plant is being renovated. Remote location. Weak grid. Only 40A for the entire site.
Our Neargrid battery went in right next to the crane, delivered by . No long cables. No grid upgrades. Just plug, power, and go.
Remote monitoring keeps watch 24/7, so there’s no one babysitting on-site and no surprises.
Without battery storage, this job simply wasn’t possible.
Any site. Any terrain. Zero downtime. 🏔️
Follow .solutions for more on emission-free, reliable power for construction sites.
appenzell towercrane stirnimann plugandplay remotemonitoring constructionsite cleanenergy swissalps baustellenstrom