09/08/2026
With the cost of carrying the home increasing, the homeowner decided to convert it into a two-bedroom rental suite. The expected rental income could cover close to half of the monthly mortgage payment.
The existing space, however, was not ready to rent.
A load-bearing wall separated the flex area from the living space. The floor sat eight inches lower on one side. There was no kitchen. The bathroom needed a shower, and a large shutter-style exterior opening had to be replaced with an insulated wall and bedroom window.
The homeowner also wanted the suite ready within four weeks.
We did not begin with rushed demolition.
First, we measured the existing space and completed the layout. We then coordinated the structural work, electrical system, plumbing, drainage, ventilation and heating.
The kitchen was positioned between the mechanical room and electrical panel. This shortened the water lines, drainage and dedicated electrical runs required for the appliances.
A structural engineer designed the reinforcement needed to remove the load-bearing wall safely. Once the new structure was in place, the wall was removed and the two areas became one continuous suite.
The original plan included electric baseboard heaters. After an HVAC specialist reviewed the furnace capacity, we extended the existing central heating system into the new bedroom and living area instead.
The bathroom closet was converted into a shower. Large-format 36-by-36-inch porcelain tile reduced the number of grout lines and created a cleaner finish.
The cabinet boxes were built from three-quarter-inch plywood, with durable melamine doors selected for rental use. COB under-cabinet lighting was added without increasing the project price.
Separate shut-off valves were installed for the kitchen and bathroom, making future plumbing maintenance easier.
The eight-inch floor difference was resolved with a custom step made from the same laminate flooring. Raising the full floor would have reduced the ceiling height, so the step provided a cleaner and more practical solution.
When the existing exterior siding colour was found to be discontinued, we continued sourcing until matching inventory was located rather than installing an obviously different shade.
Licensed electrical and plumbing trades, the drywall team, tile setter and cabinet team worked on overlapping schedules. Harad Construction managed that coordination so the homeowner did not have to.
Four weeks later, the suite was handed over on the promised date, within the agreed budget and in line with the approved design.
The homeowner told us:
“For the first time, I never felt that I had to manage the project or worry about what was happening next.”
A renovation should improve the property without taking over the owner’s life.
Planning a rental suite, basement renovation or ground-level conversion in Langley or the Lower Mainland?
Send Harad Construction three photos, the approximate square footage, the location and your preferred timeline.