BK Energy

Website

BK Energy Beiken Energy Group Co., Ltd. ("BK Energy”in short) is an integrated energy company.

We focus on oil and gas exploration and development, integrated engineering services and management, and energy technology as our core businesses.

Celebrating Mid-Autumn Festival | Best wishes to our global partners from BK Energy.
25/09/2026

Celebrating Mid-Autumn Festival | Best wishes to our global partners from BK Energy.

BEIKEN ENERGY Coiled Tubing Case StudyCNPC Zu 201H21 Shale Gas Well Project
14/08/2026

BEIKEN ENERGY Coiled Tubing Case Study
CNPC Zu 201H21 Shale Gas Well Project

Blessed Eid al-Adhaعيد الأضحى مباركFrom BK Energy
27/05/2026

Blessed Eid al-Adha
عيد الأضحى مبارك

From BK Energy

40°C Heat. Power Shortages. Still Delivered.In Chongqing, BK Energy undertook a major shale gas fracturing project where...
11/05/2026

40°C Heat. Power Shortages. Still Delivered.

In Chongqing, BK Energy undertook a major shale gas fracturing project where temperatures soared above 40°C, while regional power restrictions threatened to slow operations.
Instead of compromising, we adapted.
By deploying the region’s largest shale gas onsite power generation system and implementing a hybrid energy model combining grid power, natural gas, and diesel backup, we ensured stable, reliable, and lower-carbon operations throughout the project.
We also:
* Maintained equipment at full operating capacity through advanced cooling and system optimization solutions
* Doubled proppant delivery efficiency through intelligent system upgrades
The Results
* 189 fracturing stages completed in 92 days
* Up to 4 stages per day
* New client record: 2.61 stages/day
* Zero incidents. Zero casing deformation.
Delivering performance where it matters most.

In 2026, BK Energy delivered coiled tubing services for a shale development project in Sichuan, China.Our team successfu...
29/04/2026

In 2026, BK Energy delivered coiled tubing services for a shale development project in Sichuan, China.

Our team successfully completed:
√ Milling of 42 bridge plugs
√ Two wellbore cleanout operations
√ One perforation job

Through reliable ex*****on and strong on-site technical support, we enabled the client to efficiently complete 44-stage hydraulic fracturing operations.

At BK Energy, we are committed to delivering safe, efficient, and high-quality technical services that maximize operational performance and overall project value.

In Sichuan, BK Energy successfully completed a challenging fracturing project for CNPC — and the results speak for thems...
24/04/2026

In Sichuan, BK Energy successfully completed a challenging fracturing project for CNPC — and the results speak for themselves.

Working under a tight schedule, complex geological conditions, and high coordination demands, our team remained focused, collaborated seamlessly with partners, and delivered:

✔ 44 stages completed across 2 wells
✔ Flowback completed in just 11 hours
✔ 2,300 m³ of recovered fluid — setting a new benchmark
✔ Zero safety incidents throughout the project

Behind these results is a team committed to precision, safety, and disciplined ex*****on.

From planning through on-site delivery, every step was carefully controlled, coordinated, and optimized — ensuring smooth and efficient project ex*****on.

Proud of the team. Ready for the next challenge.

Delivering Efficiency Under Extreme ConditionsIn 2024, BK Energy successfully executed a coalbed methane fracturing proj...
17/04/2026

Delivering Efficiency Under Extreme Conditions

In 2024, BK Energy successfully executed a coalbed methane fracturing project in Xinjiang under extreme desert conditions, where temperatures reached 40°C and water resources were severely limited.

Through advanced planning, optimized resource allocation, and the deployment of dual perforation crews, the project maintained high operational efficiency despite environmental challenges.

Key Results:
57 fracturing stages completed in just 18 days
Average of 3.12 stages per day across the full cycle
Peak performance of 6 stages in a single day (per well)
Multiple new records set for CBM fracturing operations in the region

This project once again demonstrates BK Energy’s capability to deliver safe, efficient, and high-performance operations in complex environments.

Project CaseService Content: Integrated Drilling and FracturingTime: 2025–2026Client Requirements:To promote the seconda...
10/04/2026

Project Case

Service Content: Integrated Drilling and Fracturing

Time: 2025–2026

Client Requirements:To promote the secondary development and continuous expansion of mature blocks through the exploration and development of this well.

Our Solution:Adopted an integrated geology-engineering approach. Identified high-permeability fault-fracture zones around faults as geological sweet spots; achieved precise control of large 3D well trajectories and loss prevention as engineering sweet spots.

Core Project Achievements:A high-yield industrial gas flow of 126,200 m³/day was successfully tested, providing valuable experience for the secondary development of mature oil and gas fields.

At 3:00 PM on March 27, BK Energy’s first CCUS project in Xinjiang—the PetroChina Xinjiang Oilfield Block 8 CCUS Surface...
03/04/2026

At 3:00 PM on March 27, BK Energy’s first CCUS project in Xinjiang—the PetroChina Xinjiang Oilfield Block 8 CCUS Surface Injection Technical Service Project—officially commenced operations. The well is a liquid CO₂ injection well with a designed daily injection rate of 60 tons, equivalent to planting approximately 560 trees per day based on domestic CCUS project benchmarks.
The project launch marks a solid step forward for BK Energy in the carbon capture, utilization, and storage (CCUS) sector. The company will continue to provide high-quality technical services to support low-carbon oil and gas development for its clients.

Great News!BK Energy has reached another major milestone at the ZU 203H19-2 well in Southwest China.In this deep shale g...
31/03/2026

Great News!
BK Energy has reached another major milestone at the ZU 203H19-2 well in Southwest China.
In this deep shale gas project, our team successfully completed a 2,200-meter horizontal section in a single run during the fourth drilling phase—establishing a new block record.
This achievement underscores BK Energy’s expertise in high-efficiency deep shale gas drilling and reflects our continued commitment to delivering innovative, high-performance solutions for unconventional energy development.

Address

Olympic Culture Business Park, Aoti Middle Road, Chaoyang District
Beijing
100026

Opening Hours

Monday 09:00 - 17:30
Tuesday 09:00 - 17:30
Wednesday 09:00 - 17:30
Thursday 09:00 - 17:30
Friday 09:00 - 17:30

Alerts

Be the first to know and let us send you an email when BK Energy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share