Modular container house

Modular container house Container house/Prefabricated house/ Modular house/ Customizable

Install rooftop solar panels on modular houses and enjoy greater energy independence with clean, sustainable power.
06/07/2026

Install rooftop solar panels on modular houses and enjoy greater energy independence with clean, sustainable power.

29/06/2026

Vlog:6-29,2026/Loading and Shipment of Triangular and Other Special-Shaped Modular Houses

24/06/2026

Custom Black Electrostatic Powder Coated Frame

23/06/2026

The wall panels of the folding container house are pre-assembled. Electrical wiring, sockets, and switches are fully installed before shipment, significantly reducing on-site installation time.

18/06/2026

Prefabrication Process of Folding Container Houses Before Leaving the Factory:

Step 1: Joint assembly of sandwich wall panels and pre-routing of electrical wires and sockets.
Step 2: Ceiling wiring layout, and installation of the ceiling and LED lights.

Step 3: Assembly of the main frame and installation of folding accessories.

Step 4: Installation of doors and windows, and securing of the wall panels.

Step 5: Folding into shape and final packaging completion.

15/06/2026

Detachable Container Houses / Flat-Pack Container Houses / Z-Fold Folding Container Houses / Expandable Butterfly Container Houses, as well as supporting materials: steel doors, double-glazed windows, folding bunk beds, kitchen cabinets, prefabricated bathroom plumbing, etc.
Orders can be delivered on time.

Installation requires only one crane and a few workers.

3 workers can complete the installation of 3 sets of flat-pack container houses, 10 sets of Z-fold folding container houses, or 2 sets of detachable container houses within one day.

One 40HQ container can hold up to 17 sets of standard houses, saving half the shipping costs.

The units can be transported as a whole without disassembly when changing project sites.

14/06/2026

6-14-2026/Container House Installation/ Bottom Frame Bearing Board & Decorative Layer Installation | Top Frame Welding

29/05/2026

Intertek-certified thermal insulation windows

28/05/2026

May 28, 2026 | Workshop Vlog
8m Main Frame Welding | Top Frame Insulation & Waterproofing | Freshly Baked Top Frame & Pillar Powder Coating

25/05/2026

Abrasion resistance of the main frame coating after powder spraying and high-temperature curing.

Address

Weifang

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Alerts

Be the first to know and let us send you an email when Modular container house posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share