22/05/2026
⚡ Smart Energy Upgrade for Mining Operations
Far East Battery’s 5MW/10MWh energy storage power station project at Fengcheng Coal Mine in Jiangxi, China has officially been connected to the grid.
The project adopts a “PV + ESS” coordinated operation strategy, combining daytime solar-storage synergy with nighttime peak-valley arbitrage to improve renewable energy consumption, optimize energy dispatch, and reduce electricity costs for mining operations.
Configured with:
🔋 2 × 5MWh liquid-cooled energy storage containers
⚙️ 1 × 5MW booster PCS integrated unit
🧠 Far East Battery self-developed EMS
The project utilizes the PowerSTROM 5000 liquid-cooled energy storage system, featuring:
✅ High safety architecture
✅ Intelligent thermal management
✅ Black start capability
✅ Remote smart dispatching
✅ Stable power support for high-demand industrial scenarios
Designed for high-safety mining applications, the project helps enhance energy efficiency, operational reliability, and sustainable transformation for traditional industrial sectors.