SCC air compressors SCC air compressors in Wendlingen am Neckar bietet Schrauben- und Scrollkompressoren sowie Druckluftaufbereitung für industrielle Anwendungen.

Technische Beratung, Ersatzteile und Serviceunterstützung ergänzen das Sortiment.

https://eu1.hubs.ly/H0yxvBS0A leak repair reduces air demand.How much electricity it saves depends on what the compresso...
25/09/2026

https://eu1.hubs.ly/H0yxvBS0
A leak repair reduces air demand.

How much electricity it saves depends on what the compressor station does next.

That distinction matters when maintenance presents a payback calculation.

Multiplying leakage flow by a full-load specific-power value can provide a useful first estimate. But it assumes electrical power falls proportionally as air demand decreases.

A load/unload compressor may spend longer running unloaded, while still consuming electricity. A variable-speed machine responds differently within its control range. In a station with several compressors, the sequencing determines which machine responds at all.

Before turning an estimate into an investment commitment, ask:
• Which compressor will respond to the lower demand?
• How will its electrical input change in that operating range?
• How will we verify the result under comparable production conditions?

Measuring station power and airflow together, or using a validated system model, provides a stronger basis for the decision.
Repair priorities also need to account for safety and availability. A small calculated energy benefit does not make a leak harmless.

Our article explains how to move from a leakage measurement to a defensible cost estimate: Read the full article https://eu1.hubs.ly/H0yxvBS0

https://eu1.hubs.ly/H0yxtz80 How much usable air does a 1,000-litre receiver actually provide?The answer depends on the ...
23/09/2026

https://eu1.hubs.ly/H0yxtz80
How much usable air does a 1,000-litre receiver actually provide?

The answer depends on the pressure drop your process can tolerate.

Receiver volume alone is not enough to determine how long it can support a demand peak. The usable pressure range matters just as much.

Take the worked example in our latest article: a 1,000-litre receiver operating between 8.0 and 6.5 bar(g). Assuming equal temperatures and a reference pressure of 1.013 bar absolute, it releases approximately 1.48 m³ of air at that reference condition.

If demand exceeds compressor delivery by 1.2 m³/min, that represents roughly 74 seconds of support.

This is a simplified calculation, not a guaranteed operating result. Cooling during discharge can reduce the usable quantity, and pressure losses between the receiver and the machine must also be considered.

Before choosing a receiver, establish:
• How much demand exceeds supply during the peak.
• How long that peak lasts.
• The minimum pressure required at the most demanding point of use.

Our article walks through the calculation, its assumptions and the wider sizing considerations: Read the full article https://eu1.hubs.ly/H0yxtz80

A leak survey gives maintenance a list of problems.Which ones deserve the next available maintenance window?The loudest ...
17/09/2026

A leak survey gives maintenance a list of problems.

Which ones deserve the next available maintenance window?
The loudest leak can attract attention first. But repair priorities need to consider estimated leakage flow alongside the hours each section remains pressurised. A quieter leak on a continuously pressurised line may warrant attention before a louder one on equipment used briefly.

Access and production constraints matter as well. A repair requiring a lifting platform or a shutdown needs different planning from an accessible connection. Safety and quality concerns take precedence over the energy assessment.

A practical way to organise the findings is to separate them into three groups:

• Repairs that can safely proceed without affecting production.
• Repairs for the next maintenance window.
• Repairs requiring a shutdown.

Give each action an owner, a target date and a follow-up check. If the same component keeps appearing in the log, investigate the cause of that recurrence.

Our guide explains how to turn survey findings into a repair plan: Read the full article https://eu1.hubs.ly/H0ypvw20

🔧 Three compressors, open enclosures and a closer look at compressed air on the farm.At the Milchhof Reeßum open day on ...
11/09/2026

🔧 Three compressors, open enclosures and a closer look at compressed air on the farm.

At the Milchhof Reeßum open day on 30 August, our Premium Dealer Kronwald brought the SCROLLI 3, BASE 7 VSD and STORM 7 for visitors to explore. The SCROLLI attracted particular interest, with conversations turning to compressed air in automatic milking systems.

One practical takeaway: start with the milking equipment manufacturer’s requirements for pressure, air flow and air quality. These provide the basis for selecting the compressor and air treatment, alongside the farm’s actual demand and installation conditions.

Oil-free compression should be assessed against those specific requirements. Drying and condensate drainage also need attention to help prevent moisture problems downstream.

Thank you to the Kronwald team for bringing SCC air compressors to Reeßum and taking the time to discuss the practical needs of local farms.

Read the full event review and the key considerations for compressor selection:
https://eu1.hubs.ly/H0ygmPW0

✅ https://eu1.hubs.ly/H0ychvD0 Anyone can print a datasheet. Independently measured figures are a different thing. The S...
10/09/2026

✅ https://eu1.hubs.ly/H0ychvD0 Anyone can print a datasheet. Independently measured figures are a different thing.

The SCC STRONG 11 has passed independent performance testing under the BCAS Performance Verification Programme. ⚙️

The unit tested was the STRONG 11-10 — the STRONG 11 configured for 10 barg — selected by BCAS, not by us, and tested at TÜV SÜD National Engineering Laboratory in East Kilbride.

For a variable speed machine, one operating point would not have told the full story. So the programme verifies published data at five points across the speed range, alongside pressure, total package power, Specific Energy Requirement and no-load power.

Why that matters when you specify:

📊 the figures were checked by someone other than the manufacturer
📐 ISO 1217:2009 handles variable speed units separately, in Annex E
⚡ SER relates power input to delivered airflow, so machines can be compared on the same basis
🔍 results are recorded on a public register anyone can check

Worth being precise about what verification is: it does not produce new performance figures. It establishes whether the published ones hold up under controlled conditions.

SCC has now been through both rounds run so far — the SMART 7 at 7 kW fixed speed, and the STRONG 11 at 11 kW variable speed. We are one of the first manufacturers to pass the second stage.

🔗 The full write-up, including what each measurement actually means: https://eu1.hubs.ly/H0ychvD0

📐 https://eu1.hubs.ly/H0y7Hgj0 A flow figure without a stated reference condition tells you almost nothing.It looks like...
08/09/2026

📐 https://eu1.hubs.ly/H0y7Hgj0 A flow figure without a stated reference condition tells you almost nothing.

It looks like a number. It behaves like one. But it cannot be compared to anything.

Operating volumetric flow, standard volumetric flow and mass flow are three different variables. Mixing them is the most common reason two "measured" values from the same plant refuse to agree.

DIN 1343 defines the terms reference condition, standard condition and standard volume — the values themselves belong in the standard, not in a rule of thumb.

On the manufacturer side, ISO 1217 covers acceptance tests for positive displacement compressors, including volume rate of flow and power requirement. That does not mean every delivery rate on every data sheet uses the same reference condition. Which one applies has to come from that specific data sheet.

So before anything is ordered:
📋 decide which variable the device should output 📋 decide which reference condition is stored in it 📋 put both in writing in the request to the supplier 📋 carry both into every later evaluation

Our new article walks through the measurement concept behind that — which variable each method actually captures, and how it becomes an operating, mass or standard value.

🔗 Read more: https://eu1.hubs.ly/H0y7Hgj0

When you last compared a measured flow against a data sheet — did both sides state the same reference condition?

⏱️ https://eu1.hubs.ly/H0x_6gw0 A load profile is only as good as the four decisions made before the logger starts.Any o...
03/09/2026

⏱️ https://eu1.hubs.ly/H0x_6gw0 A load profile is only as good as the four decisions made before the logger starts.

Any one of them can quietly invalidate a whole measurement week.

📏 Output quantity and reference conditions. Does the device output operating flow rate, standard flow rate or mass flow, and which reference conditions are stored? Compressor data, consumer data and meter readings are comparable only on the same basis — so that basis belongs in every evaluation and in every enquiry to a supplier.
🔧 Installation and measurement range. Inlet and outlet sections and pipe geometry follow the manufacturer's specification, not a rule of thumb. And an oversized meter is not a safety buffer: low nighttime flow then drops below the range in which the device still measures accurately.
⏲️ Measurement interval. It must be significantly shorter than the shortest event relevant to the decision, and it must account for the response time of sensor and logger. Averages over several minutes give you a smoothed profile — workable for an annual energy balance, not for judging short peaks or storage sizing.
🗓️ The measurement window. Seven consecutive days are a practical example, not a guarantee of representativeness. Check that the relevant shifts, products and operating modes are inside it — and whether cleaning or changeover cycles with high demand fall into that week.

One point that is not up for discussion: data loggers and measuring devices may be connected only via an interface provided for that purpose, in line with the compressor or control manufacturer's specification, and by authorized and qualified personnel.

🔗 Read more: https://eu1.hubs.ly/H0x_6gw0

Which of these four has cost you a measurement week before?

✅ https://eu1.hubs.ly/H0xZMP-0 An ISO 8573-1 class code defines a purity target. On its own, it does not define a comple...
01/09/2026

✅ https://eu1.hubs.ly/H0xZMP-0 An ISO 8573-1 class code defines a purity target. On its own, it does not define a complete acceptance specification.

Two parties can agree on ISO 8573-1:2010 [2:4:2] and still disagree at handover if the measurement point, operating envelope and verification method were never defined.

Our new article explains what a robust procurement and acceptance specification should record alongside the ISO 8573-1 class code:

📅 Standard designation and publication year, for example ISO 8573-1:2010. Earlier editions may still appear in contracts; without the year, the requirement can be ambiguous.
🔢 The class for each contaminant, in the order particles : water : oil. Each contaminant is classified separately.
0️⃣ For Class 0: the relevant contaminant and an agreed numerical limit stricter than Class 1, including the conditions under which it applies.
📍 The measurement point at which the class must be met. Downstream treatment may improve purity, while storage and distribution can degrade it again.
🌡️ The design and acceptance envelope: volume flow, operating pressure, treatment inlet temperature and ambient temperature. Treatment components are rated for defined conditions, and deviations can change their performance.
🧪 The applicable ISO 8573 test method and edition for each contaminant, including the relevant sampling requirements. Without methodological consistency, a result cannot validate the specified class.

One important note for procurement: the binding limit values for each class should be taken from the licensed standard. Manufacturer summaries can help with orientation, but they should not be used as the contractual source.

🔗 Read the full article: https://eu1.hubs.ly/H0xZMP-0

Which is most often missing in the specifications you review: the measurement point, the operating envelope or the test method?

⏱️ https://eu1.hubs.ly/H0xM7QK0 A high idle share is an indicator. It is not a finding.A load/idle-controlled screw comp...
27/08/2026

⏱️ https://eu1.hubs.ly/H0xM7QK0 A high idle share is an indicator. It is not a finding.

A load/idle-controlled screw compressor keeps running after delivery is switched off and still draws electrical power — without producing any compressed air. So yes, it is a cost block. But the jump straight from "high idle hours" to "the machine is oversized" is where a lot of money gets spent on the wrong answer. ⚙️

The possible causes are several, and they lead to completely different measures:

🔹 oversizing relative to actual demand
🔹 control parameters set unfavorably — run-on times, switching thresholds
🔹 missing or poorly coordinated master control across multiple compressors
🔹 too little storage volume for the demand pattern that actually exists
🔹 strongly fluctuating demand with short load peaks
🔹 a pressure band that does not fit the system
🔹 a system or maintenance issue, such as a defective inlet valve

Load hours, idle hours and switching frequency are available in the controller of most machines. On their own they show that something does not match. What it is only becomes clear alongside the load profile and the system condition. And there is no universally valid maximum number of motor starts per hour — the permissible value depends on compressor type, control method and the manufacturer's specification.

The same caution applies one step further on. Whether variable speed is more economical than fixed speed cannot be decided from the control concept alone: load duration profile, minimum and maximum demand, specific power at the relevant operating points, the combination and control of several machines, investment, maintenance and required redundancy all belong in that comparison.

🔗 Full article: https://eu1.hubs.ly/H0xM7QK0

When did you last read the load and idle hours off your controllers — and did the load profile sit next to them?

🔌 A 4-day week in production changes more than the shift plan.If the chosen model creates a longer non-production phase,...
24/08/2026

🔌 A 4-day week in production changes more than the shift plan.

If the chosen model creates a longer non-production phase, the compressed air station also needs a defined shutdown and restart concept — not just an established habit.

Before the 4-day week is introduced, four questions about the compressed air network need written answers:

1️⃣ Which network sections will be isolated or depressurized — and which must remain under pressure?
2️⃣ Which consumers still need compressed air during the non-production phase?
3️⃣ Which control, safety or standby functions require compressed air, and how will residual energy be managed safely?
4️⃣ Who authorizes the restart — and when are the required pressure and air quality reliably available again at the point of use?

The relevant system boundary does not end at the compressor. It includes treatment, receivers, distribution and every consumer that continues to draw air outside production hours. Until that boundary is defined, the decision about what can safely be shut down cannot be made reliably.
If a network section is fully depressurized, its pressure-related losses stop for the duration of that phase. But this is only useful when shutdown and restart are safe, documented and technically prepared.

🔗 The full article includes a 12-point checklist for assessing a 4-day week in production: https://eu1.hubs.ly/H0xM7Sm0

Adresse

Wertstraße 44
Wendlingen
73240

Öffnungszeiten

Montag 08:00 - 16:00
Dienstag 08:00 - 16:00
Mittwoch 08:00 - 16:00
Donnerstag 08:00 - 16:00
Freitag 08:00 - 16:00

Benachrichtigungen

Erfahren Sie als Erste/r von Neuigkeiten und Aktionen: Wir schicken Ihnen eine E-Mail, wenn SCC air compressors etwas veröffentlicht. Ihre E-Mail-Adresse wird für keinen anderen Zweck verwendet, und Sie können sich jederzeit abmelden.

Verknüpfungen

Teilen

Technische Unternehmen in der Nähe