Taziker

Taziker Taziker is a multi-discipline specialist contractor, providing protective coatings, structural refurbishments and strengthening throughout the UK.

Taziker is a leading multi-disciplinary engineering contractor specialising in undertaking key maintenance, refurbishment and replacement works to critical UK infrastructure. Employing more than 500 people, we operate from ten regional locations supported by a Support Services office in Lancashire. The company is comprised of five key operations: Infrastructure, Engineering Solutions, Environmenta

l Engineering, Access Solutions and Industrial Services. Within these operations sit our multi-disciplinary specialist skills and capabilities including structural strengthening, scaffolding, encapsulation, protective coatings, fabrication, geotechnical engineering and more. Our company mission is to responsibly regenerate and sustain our national infrastructure through engineering excellence and innovation in design through operational delivery.

Ellie and Georgina really enjoyed talking to the students at Blackrod Church School. We hope the pupils have learnt more...
17/06/2022

Ellie and Georgina really enjoyed talking to the students at Blackrod Church School. We hope the pupils have learnt more about engineering and construction, as well as the many opportunities that will be available to all of them in their future careers!

Did you know just off the M66/M60/M62 motorway network, Taziker Industrial has a 45,000 Sqft Fabrication Facility where ...
31/01/2020

Did you know just off the M66/M60/M62 motorway network, Taziker Industrial has a 45,000 Sqft Fabrication Facility where we are currently building gantries, footbridges and rollercoasters. The facility is headed up by Jarrod E Hulme with over 31 years experience on complex steel structures.

• 8 Overhead Cranes
• Manage various tonnage to client desires (Bespoke Service)
• 5 Fabrication bays with access and egress for loads up to 27m in Length
• 28-meter span length and up to 4 metres wide
• Excellent location with access to the motorway network
• Service provider to Network Rail for OLE, Structures and Bridges
• Capable of providing full trial assembly in house of up to 60 metres
• Tekla & Auto Cad BIM Efficient
• 3D Construction sequencing
• Leica Surveying equipment. 44-metre accuracy +/- 2mm

Taziker Industrial are delighted to have won, with our client Network Rail, the structures award at the 2019 National Ra...
09/12/2019

Taziker Industrial are delighted to have won, with our client Network Rail, the structures award at the 2019 National Rail Heritage Awards held in London on 4th December 2019.

This award was presented for our recent works restoring South Esk Viaduct in Montrose, Scotland.

The value of this contract was £4.5 million with the works undertaken at this 16 span structure comprising of scaffolding, surface preparation & coatings, strengthening, steel repairs, installation of new GRP trackside walkways and masonry repairs.

Accepting the award from Princess Anne, HRH Princess Royal is our Project Manager Tom Galletly along with Network Rail Scheme Project Manager Laura Craig.

This is an honour for the team involved and marks back to back wins following the Tay Bridge refurbishment project success in 2018.

Our head office staff had an enjoyable day getting involved in various competitions and games, to win prizes and raise m...
18/11/2019

Our head office staff had an enjoyable day getting involved in various competitions and games, to win prizes and raise money for Children in Need. The staff took part in quizzes; guess the world-famous bridges, guess the senior management baby photo and play your cards right. We managed to raise £261.

While never forgetting the importance of what the charity does. BBC Children in Need exists to change the lives of disadvantaged children and young people across the UK. Their vision is that every child in the UK has a safe, happy and secure childhood and the chance to reach their potential.

Another job successfully carried out by our team in Scotland. The Grade C listed Strathbungo Footbridge – located in Gla...
14/05/2019

Another job successfully carried out by our team in Scotland. The Grade C listed Strathbungo Footbridge – located in Glasgow & erected in 1877 – was in dire need of refurbishment so Network Rail allocated £650,000 to the scheme. After three and a half tonnes of steel was used to repair & strengthen the structure we applied 600 litres of paint.

https://www.eveningtimes.co.uk/news/17594441.historic-footbridge-restored-in-glasgows-south-side/

A former footbridge in Glasgow's South Side has been refurbished after closing last year.

Bournemouth Station Canopy work has been completed. We hope that both our client South Western Railway and the local peo...
25/04/2019

Bournemouth Station Canopy work has been completed.

We hope that both our client South Western Railway and the local people of Bournemouth are as happy as we are.

The project was to revitalise the canopy and restore the station's original appearance. The works comprised of:

• Removed and replaced one section of the canopy above the main entrance to the station.
• The repainting of the existing trusses.
• Installation of new drainage to the canopy including gutters, downpipes and daggerboards.
• Removal of failed brickwork back to a sound level, installation of new parapet walls, complete with decorative coping stones and finials.
• Associated waterproofing works to the rear of the new parapet.

A Fantastic win for the South West Office. We are pleased to be continuing our work on the Tamar Road Bridge. A signific...
05/04/2019

A Fantastic win for the South West Office. We are pleased to be continuing our work on the Tamar Road Bridge. A significant project to be delivered over a 12-month programme refurbishing 7200 GRP Kerbs.

Our scope of work for the project include:

- Remove and retain existing kerb units for re-use.
- Remove existing mild steel holding down studs, clean and shot blast bridge deck to remove corrosion.
- Undertake Plate testing (MPI) and, if necessary, undertake Weld repairs.
- Weld new stainless steel holding down studs to the prepared bridge deck; Undertake Weld Test; Prime and waterproof the bridge deck with a high-performance waterproofing system;
- Reinstate kerb units and fix down using new stainless steel fixings;
- Make good to all Drainage connections, with all of these aforementioned activities
- Strict associated Traffic Management control.

The bridge's waterproofing system and kerb bolts need sorting

Taziker Industrial is pleased to welcome Jarrod Hulmes as our Engineering Service Director to run our new Fabrication fa...
01/04/2019

Taziker Industrial is pleased to welcome Jarrod Hulmes as our Engineering Service Director to run our new Fabrication facility and develop our Services to supply & deliver Complex Structural Steelwork.

Jarrod has over 31 years of experience in Structural Steelwork and joins us from Severfield. His past projects include the new steelwork fabrication of Manchester Victoria Station, Ordsall Chord and the Orbit Structure located at the Olympic Park in London.

Our new Workshop is just under 45,000 SqFT and has the following capability.

• 8 Overhead cranes with lifting maximum capacity of 10t.
• 5 Fabrication bays with access and egress for loads up to 27m in length.
• Excellent location with access to M62 motorway.
• Service provider to Network Rail for OLE Structures and Bridges.
• Capable of providing full trial assembly in house.
• Tekla & Auto Cad BIM Efficient.
• 3D Construction Sequencing.

01/02/2019

We are now looking for a Payroll and Accounts Assistant to join our great Finance team at Head Office in Horwich, working primarily with the Network Scaffolding part of our business.

The main focus for this role will initially be the weekly payroll with some involvement in other accounts areas.

This would also suit someone part AAT qualified who we can support through their studies (not essential).

Ideal candidate must have excellent Excel skills and able to work to deadlines.
In return we offer a competitive package, development opportunities and a great working environment.

If you would like to apply or would like further details, please email your CV to [email protected]

Good luck to everyone running the   this Sunday the 14th of October, including our own Rebecca Pope who is raising funds...
12/10/2018

Good luck to everyone running the this Sunday the 14th of October, including our own Rebecca Pope who is raising funds for The Christie NHS Foundation Trust

If you can help her by sponsoring anything for this fantastic cause please head to https://www.justgiving.com/fundraising/rebecca-pope5 and donate. Best of luck Rebecca, from all at Taziker Industrial!

Taziker Industrial and Buckingham Group Contracting Limited have been refurbishing the 93m, three span wrought iron Grad...
10/10/2018

Taziker Industrial and Buckingham Group Contracting Limited have been refurbishing the 93m, three span wrought iron Grade II listed Runcorn Viaduct on behalf of Network Rail which included the cast iron Runcorn Navigation Bell.

The bell was gifted to Halton Borough Council by Network Rail and in May 2018 during a possession Taziker arranged for a helicopter removal from the structure before being refurbished.

Today marks its unveiling in its new home The Brindley Theatre to coincide with the 150th Anniversary of the Runcorn Viaduct opening. Great day for the !

Address

Levens House, Ackhurst Business Park, Foxhole Road
Chorley
PR71NY

Alerts

Be the first to know and let us send you an email when Taziker posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Taziker:

Share