17/06/2026
A full restoration carried out on the very old hall floor at Ringwould Village Hall.
The floor had years and years of built-up varnish layers from ongoing maintenance over decades, with no full restoration carried out since the post-war period. We carried out a complete strip-back using specialist equipment hired from Jewson Deal, carefully removing all previous coatings to expose the original timber.
Once fully prepared, the floor was re-finished with a high-quality clear varnish, bringing the natural character and warmth of the timber back to life and restoring it to a clean, durable, and presentable finish for ongoing use.
A proper transformation and a great example of how tired, heavily coated floors can be fully revived with the right preparation and process.