£93,000 per year!
That was the identified energy cost savings opportunity for a North East fabrication and engineering business after one of our fully independent Asset Performance Reviews.
This project was never just about “selling solar”. It’s also about identifying lower risk non solar savings that have been missed and maybe quicker and easier to achieve.
The client already had supplier proposals on the table. What they needed was independent oversight to answer the bigger commercial questions:
• Were the systems correctly sized?
• Were savings assumptions realistic?
• Was the site already paying for unnecessary capacity?
• Were lower-risk savings being missed?
• Was the project being delivered in the right order?
By reviewing half-hourly data, peak demand, base load, ASC position, solar PV suitability and LED opportunities, we helped build a commercially challenged investment case in the correct sequence before capital was committed.
Most importantly, we stayed involved through delivery — helping protect the savings case rather than walking away after the report.
The result:
✔ Approx. £93k identified annual savings opportunity
✔ Reduced oversizing risk
✔ Better sequencing of works
✔ Funding and finance support explored
If you are considering solar PV, LEDs, batteries, HVAC or wider energy reduction projects, it is worth challenging the commercial case before signing anything.
Message me if you would like a copy of the full case study.