Survey Design Consult

Call Website Contact the business

Survey Design Consult SDC are forward-thinking project delivery consultants with years of experience.

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐒𝐩𝐨𝐭𝐥𝐢𝐠𝐡𝐭: 𝐉𝐂𝐃𝐞𝐜𝐚𝐮𝐱 𝐃𝐢𝐠𝐢𝐭𝐚𝐥 𝐀𝐝𝐯𝐞𝐫𝐭𝐢𝐬𝐢𝐧𝐠 𝐚𝐭 𝐍𝐞𝐭𝐰𝐨𝐫𝐤 𝐑𝐚𝐢𝐥 𝐒𝐭𝐚𝐭𝐢𝐨𝐧𝐬 🚉We’ve been delivering the electrical design fo...
03/11/2026

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐒𝐩𝐨𝐭𝐥𝐢𝐠𝐡𝐭: 𝐉𝐂𝐃𝐞𝐜𝐚𝐮𝐱 𝐃𝐢𝐠𝐢𝐭𝐚𝐥 𝐀𝐝𝐯𝐞𝐫𝐭𝐢𝐬𝐢𝐧𝐠 𝐚𝐭 𝐍𝐞𝐭𝐰𝐨𝐫𝐤 𝐑𝐚𝐢𝐥 𝐒𝐭𝐚𝐭𝐢𝐨𝐧𝐬 🚉

We’ve been delivering the electrical design for JCDecaux’s new digital advertising panels across three of the UK’s busiest railway stations:
📍 Birmingham New Street�📍 Liverpool Lime Street�📍 Manchester Piccadilly
Our scope:�⚡ Electrical infrastructure for new D6 digital 6-sheet panels and double-sided totems�⚡ Supplies, containment and protection�⚡ Coordination with existing station systems
Every element was designed around the realities of a 24/7 operational railway, where downtime simply isn’t an option.
Beyond design, we supported the project through installation and certification, working closely with CPMS to get each site signed off.
A big thank you to everyone involved for a fantastic collaboration. 🤝

𝐒𝐢𝐠𝐧𝐚𝐠𝐞 𝐨𝐧 𝐬𝐢𝐭𝐞 📍It’s always a proud moment to see the SDC name alongside the rest of the project team.For us, it’s abou...
02/11/2026

𝐒𝐢𝐠𝐧𝐚𝐠𝐞 𝐨𝐧 𝐬𝐢𝐭𝐞 📍

It’s always a proud moment to see the SDC name alongside the rest of the project team.

For us, it’s about more than visibility. Being present on site is a key part of how we work. Design decisions made on paper are only as good as how they translate into the building, and that’s much easier to get right when you’ve seen the space for yourself.

Regular time on site means we can spot potential issues early, answer questions from contractors face to face and make sure the M&E and lighting design is installed as intended. It also builds strong working relationships with the wider project team, which keeps everyone aligned and the project moving.
Good design doesn’t stop at the drawing board, and neither do we.

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐮𝐩𝐝𝐚𝐭𝐞 🔌Work is moving along on one of our current commercial M&E projects, and this one is all about striking t...
27/10/2026

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐮𝐩𝐝𝐚𝐭𝐞 🔌

Work is moving along on one of our current commercial M&E projects, and this one is all about striking the right balance between old and new.
Rather than replacing everything, we’re keeping as much of the existing lighting as we can. Our team is running calculations to confirm it still gives the light levels a commercial space needs, which keeps costs down and avoids throwing out fittings that still do the job.
The new elements of the design include an updated fire alarm system and new small power throughout, planned around how the building will be used day to day.
It’s a reminder that every building comes with its own story, and part of our job is working out which parts of it to keep.
More updates to come as the project progresses 👀

𝐎𝐧 𝐬𝐢𝐭𝐞 𝐭𝐡𝐢𝐬 𝐰𝐞𝐞𝐤 𝐟𝐨𝐫 𝐚 𝐦𝐞𝐜𝐡𝐚𝐧𝐢𝐜𝐚𝐥 𝐬𝐮𝐫𝐯𝐞𝐲 𝐚𝐧𝐝 𝐰𝐚𝐥𝐤 𝐫𝐨𝐮𝐧𝐝 𝐨𝐧 𝐚𝐧 𝐨𝐧𝐠𝐨𝐢𝐧𝐠 𝐡𝐨𝐭𝐞𝐥 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 🏨In a hotel, heating, cooling, vent...
23/10/2026

𝐎𝐧 𝐬𝐢𝐭𝐞 𝐭𝐡𝐢𝐬 𝐰𝐞𝐞𝐤 𝐟𝐨𝐫 𝐚 𝐦𝐞𝐜𝐡𝐚𝐧𝐢𝐜𝐚𝐥 𝐬𝐮𝐫𝐯𝐞𝐲 𝐚𝐧𝐝 𝐰𝐚𝐥𝐤 𝐫𝐨𝐮𝐧𝐝 𝐨𝐧 𝐚𝐧 𝐨𝐧𝐠𝐨𝐢𝐧𝐠 𝐡𝐨𝐭𝐞𝐥 𝐩𝐫𝐨𝐣𝐞𝐜𝐭 🏨

In a hotel, heating, cooling, ventilation and hot water have to work around the clock, because guest comfort depends on it.
That’s why we always start on site. Seeing what’s really there means fewer surprises, smarter design and a smoother project from start to finish ✅
Planning a hospitality project? Drop us a message 📲

22/10/2026

𝐆𝐫𝐞𝐚𝐭 𝐝𝐚𝐲 𝐨𝐮𝐭 𝐚𝐭 𝐭𝐡𝐞 𝐒𝐄𝐂 𝐟𝐨𝐫 𝐭𝐡𝐞 𝐒𝐜𝐨𝐭𝐭𝐢𝐬𝐡 𝐂𝐨𝐧𝐬𝐭𝐫𝐮𝐜𝐭𝐢𝐨𝐧 𝐒𝐮𝐦𝐦𝐢𝐭 🏗️

It was brilliant to spend the day among the people shaping the future of Scotland’s built environment, from developers and contractors to fellow consultants and clients.
There was a real focus on building smarter and more efficiently, and on how much earlier collaboration between design teams and contractors can save time, cost and headaches further down the line. It’s something we see on our own projects every day, and it was good to hear it echoed across the industry.
Conversations like these remind us why getting the building services right from day one matters so much. Good M&E and lighting design isn’t just about compliance, it’s about creating spaces that genuinely work for the people who use them.
If we didn’t get the chance to connect today, drop us a message, we’d love to continue the conversation.

15/10/2026

I𝐎𝐮𝐭 𝐨𝐟 𝐭𝐡𝐞 𝐨𝐟𝐟𝐢𝐜𝐞 𝐚𝐧𝐝 𝐨𝐧 𝐬𝐢𝐭𝐞 𝐢𝐧 𝐋𝐨𝐧𝐝𝐨𝐧 🏗️Our team has been visiting London clients to check in on ongoing projects, walk through progress on site and catch up face to face.Good building services design doesn’t stop at the drawings. Seeing a project in person helps us confirm the design is being installed as intended, spot potential coordination issues early and answer questions from the site team before they turn into delays. It’s also a chance to make sure we’re still aligned with the client’s priorities as the project develops.With our office at Canary Wharf, we’re well placed to support London projects on the ground as well as from our Paisley base, giving clients the same hands-on approach wherever they are.Getting out on site helps us catch issues early, support the site team and keep every project on track. 👷Do you have a project in mind? Get in touch with SDC to discuss your M&E requirements.

12/10/2026

𝐌&𝐄 𝐛𝐞𝐡𝐢𝐧𝐝 𝐭𝐡𝐞 𝐬𝐜𝐞𝐧𝐞𝐬 𝐨𝐟 𝐚 𝐧𝐞𝐰 𝐩𝐚𝐝𝐞𝐥 𝐟𝐚𝐜𝐢𝐥𝐢𝐭𝐲 🎾

While the courts might be the main attraction, there’s a lot happening behind the scenes to make a facility like this safe, functional and ready for everyday use.
SDC delivered a range of electrical and fire detection services across the facility, including:
• Emergency lighting and spotlights across the back of house and padel concourse�• Small power throughout the facility, including perimeter and cleaner’s sockets�• Fire detection, including smoke detectors in back of house areas and beam detectors across the open padel concourse�• Integration of the fire detection system with the main fire alarm panel at the front entrance
The open nature and scale of the padel concourse required a considered approach to fire detection, with beam detectors providing suitable coverage across the space.
Another example of how effective M&E design and coordination plays an important role in the delivery of modern leisure facilities.
Planning a commercial, leisure or sports facility? Get in touch with SDC to discuss your M&E requirements.

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐒𝐩𝐨𝐭𝐥𝐢𝐠𝐡𝐭 | 𝐁𝐮𝐜𝐡𝐚𝐧𝐚𝐧 𝐆𝐚𝐭𝐞 𝐎𝐟𝐟𝐢𝐜𝐞 𝐅𝐢𝐭 𝐎𝐮𝐭 📢We’re taking a closer look at our work on the Buchanan Gate office fit...
09/10/2026

𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝐒𝐩𝐨𝐭𝐥𝐢𝐠𝐡𝐭 | 𝐁𝐮𝐜𝐡𝐚𝐧𝐚𝐧 𝐆𝐚𝐭𝐞 𝐎𝐟𝐟𝐢𝐜𝐞 𝐅𝐢𝐭 𝐎𝐮𝐭 📢

We’re taking a closer look at our work on the Buchanan Gate office fit out, where SDC has completed the full M&E design through to Stage 5.
Led by Luke Lamont and Craig MacKenzie, the project has involved close collaboration between the SDC team and contractors BMES and GM Projects throughout the design and delivery process.
For SDC, successful M&E design is about more than producing drawings. Working closely with the wider project team ensures the design is practical, coordinated and suitable for delivery on site, while responding to the requirements of the finished space.
This project has been a great example of collaborative working, with the SDC team supporting the project through the detailed design process and working alongside the contractors to help bring the M&E strategy into the finished office environment.
A great project for the team and another example of the range of commercial fit out and building services projects we support across Scotland.
Planning a commercial fit out or refurbishment? Speak to the SDC team about how we can support your M&E requirements from design through to delivery.

&E

𝐓𝐰𝐨 𝐰𝐞𝐞𝐤𝐬. 𝐎𝐧𝐞 𝐟𝐮𝐥𝐥 𝐟𝐢𝐭-𝐨𝐮𝐭 𝐝𝐞𝐬𝐢𝐠𝐧 ⏱️Our team has been working on the Cat B fit-out of a new retail unit, ahead of Burge...
05/10/2026

𝐓𝐰𝐨 𝐰𝐞𝐞𝐤𝐬. 𝐎𝐧𝐞 𝐟𝐮𝐥𝐥 𝐟𝐢𝐭-𝐨𝐮𝐭 𝐝𝐞𝐬𝐢𝐠𝐧 ⏱️

Our team has been working on the Cat B fit-out of a new retail unit, ahead of Burger King moving in.
With the opening date driving the programme, the full building services design had to be completed in just two weeks. Kitchen extract, ventilation, power and lighting all had to be right first time to keep the fit-out on track.
Fast-paced projects like this are where our team thrives. 💪
Got a fit-out with a tight deadline? Get in touch 📲

𝐐𝟑 𝐑𝐞𝐜𝐚𝐩 ⏮️That's Q3 wrapped, and what a quarter it's been for the SDC team 📈 From new project wins to surveys nationwid...
01/10/2026

𝐐𝟑 𝐑𝐞𝐜𝐚𝐩 ⏮️
That's Q3 wrapped, and what a quarter it's been for the SDC team 📈 From new project wins to surveys nationwide, here's a look back at what we've been working on.

📌West Coast Scotland - Ventilation controls design and works.
📌London - MEV and emergency lighting design.
📌Highlands - EPC assessment for Fonab Castle.
📌Birmingham - Plant room overheating remedial works.
📌Glasgow - M&E works at Glasgow Central.
📌Edinburgh - M&E works at Edinburgh Waverley.
📌East Kilbride - M&E works for a padel sports facility.
📌South London - Electrical design for a 17-apartment residential development.
📌Central London - HVAC ventilation layout and mechanical design.
📌West Scotland - ATEX design for a bottle store facility.
📌Central Scotland - Mechanical design for a new development.
📌Central London - Full M&E design for a commercial property.
📌Hertfordshire - M&E design for a residential property.
📌West London - M&E design for a residential/commercial property.
📌London - M&E design and construction support.
📌East Kilbride - M&E works for a leisure facility.
📌Highlands - MDU electrical and mechanical works.
📌Aberdeenshire - Air conditioning design.
📌Inverness - Electrical works including welder socket installations.
📌Highlands - Emergency lighting design and installation.
📌West Glasgow - M&E design for a commercial property.
📌North Glasgow - Lighting column bracket replacement works.
📌Edinburgh - M&E works for a vacant commercial unit.
📌East Lothian - Lighting and cabinet replacement works at a railway station.
📌Ayrshire - Emergency lighting Form G amendment.
📌Renfrewshire - Emergency lighting Form G amendment.
📌Fort William - MDU electrical and mechanical works.
📌Liverpool - M&E works across three retail units.
📌Moray - Walkway lighting design for a signal box.
📌UK-wide - Air conditioning design across multiple sites.
📌Edinburgh - Mechanical design for a commercial property.
📌Glasgow - M&E works for an occupational health facility.
📌West London - Detailed M&E design through to construction stage.
📌Glasgow - M&E works for a major retail environment.
📌Falkirk - M&E works for a hotel project.

Would you like to work with us on an upcoming project ? Get in touch with the team today 📲

&E

Address

Glasgow

Alerts

Be the first to know and let us send you an email when Survey Design Consult posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Survey Design Consult:

Shortcuts

Share