24/11/2025
AMG Construction is proud to announce the successful completion of Phase 2 at Islington College.
This phase consisted of the full refurbishment of the college’s Animal Centre, delivered to a high standard by our dedicated team.
Our scope of works included:
• Complete drylining package
• Installation of all new fire doors
• Altro Whiterock throughout the ground floor
• Full decoration works
• Below-ground drainage
• Builders’ works in connection
A huge thank-you to everyone involved for their hard work and commitment in bringing this project to life.