07/09/2026
This upstairs hallway was in a bit of a state due to the old lath and plaster.
The ceilings were overboarded, and part of one wall was loose, so this was removed and patched up ready for a full reskim.
We even got into the small, fiddly bits in between the door architraves to make sure everything was finished properly and to the highest standard.
📍 Job location: Holt