04/12/2025
No stone left unturned on this one. Finish looks great. All works undertaken by the Seismic team.
External wall insulation and boarding.
Internal plasterboard dot & dab throughout.
Plastering full house walls and ceilings.
10 internal doors and casings.
All new skirting and architrave.
All new window boards.
Bannister and newel posts.
Kitchen install and tiled.
Bathroom cladding and sanitary.
Decoration throughout.
Flooring throughout.
Site Clearence.
Great before and after photos. Really shows what can be done with such a run down property.