Biker Group

Biker Group Based in North Yorkshire & Teesside, Biker Group Ltd provide services to the construction industry

Based in North Yorkshire and Teesside, Biker Group is a privately owned multi-faceted company providing a diverse array of services to the construction industry. Employing over 150 people directly and many more by highly vetted sub-contractors, Biker Group has become an established organisation that has grown by its reputation for delivering high quality, cost effective and professional services across all divisions.

Work is progressing well on two new agricultural buildings at a farm in North Yorkshire, with the concrete supplied from...
03/09/2026

Work is progressing well on two new agricultural buildings at a farm in North Yorkshire, with the concrete supplied from our local Dalton Plant. Supporting the project from its infancy, we initially supplied the foundations earlier in the year and, in recent weeks, delivered several large pours for the floor slabs. The scheme has comprised over 1,100m³ of concrete, demonstrating our ability to consistently deliver high volumes of quality concrete whilst meeting the specific requirements of our customers.

01/09/2026

As Biker Group Groundworks approaches the six-month milestone at Baydale Village, Darlington, we took the opportunity to reflect on the significant progress achieved on site so far. To date, the team has delivered:

• 30,000m³ of topsoil stripped and bunded
• 45,000m³ of subsoil excavated, reworked as engineered fill, or bunded
• 2,350 l/m of adoptable sewers installed
• 8,000m² of adoptable highways completed
• 45 pot foundations constructed
• 20 oversites returned for superstructure works

This progress is a testament to the commitment, expertise and hard work of our project team and supply chain partners. We're excited to see Baydale Village continue to take shape and look forward to delivering the next phases of this diverse and rewarding project in the months ahead.

27/08/2026

Quality isn’t something we check at the end of the process, it’s built into every stage of what we do. From mix design and material selection through to batching, testing, delivery and customer service, we focus on getting the details right at every step. Our quality control procedures, technical standards and experienced team help ensure every load is consistent, reliable and meets the required specification. The result is concrete that meets the requirements of the job and performs consistently on site.

20/08/2026

With river levels significantly lower than usual, this presented a valuable opportunity to support some essential repair works on the River Ure near West Tanfield and address several damaged sections across a weir. Working alongside a much valued client, our volumetric option was best suited for this project, allowing the team to produce the exact quantity required on site whilst delivering a high-quality durable mix, designed to withstand the harsh demands of the river environment.

Biker Group Groundworks is delighted to have been appointed to deliver the Earthworks, Roads, Sewers and Plotworks packa...
18/08/2026

Biker Group Groundworks is delighted to have been appointed to deliver the Earthworks, Roads, Sewers and Plotworks package for the Bolton Road development near Scorton. The residential scheme, consisting of 32 affordable homes, is being developed by Karbon Homes in partnership with Wharfedale Homes, the Knaresborough-based contractor leading the project. Captured in the summer sunshine, excellent progress has been made during the first 10 weeks on site, with works advancing well across the development. This marks our third successful project alongside Wharfedale Homes, further strengthening a valued and long-standing partnership.

Earthworks
- ~ 9,000m3 topsoil strip, cut, and filling of subsoils to achieve formation levels.
- 1,000m2 surface water detention basin and headwalls

Drainage Infrastructure

- S104 adoptable drainage (150mm–675mm diameters): approx. 1,200 l/m
- Off-site SW outfall which discharges into an existing beck and FW rising main discharging into existing Yorkshire Water apparatus.
- 1,000m² surface water detention basin and headwalls

Highways & Infrastructure Works

- S38 highway installation: 1,400m²
- Install school car parking area and sports pitch to aid local infrastructure
- Substation and all associated main service trenching across the scheme

Plotworks

-Foundations, precast flooring systems, and floor slabs for 32 units
-Plot drainage and services
-External works
-Adoptable footpaths

CGI Image courtesy of Watson Batty Architects.

With fantastic views up Wensleydale, a local housing development for a long-standing client is beginning to take shape. ...
11/08/2026

With fantastic views up Wensleydale, a local housing development for a long-standing client is beginning to take shape. Our Catterick concrete plant recently supplied an RC28/35 pump mix for the raft foundation, which was efficiently pumped directly into place to create a strong, durable base designed to deliver long-term performance for this high-quality development. We’re delighted to be involved in this project and look forward to seeing the development progress over the coming months.

Delivered using one of our volumetric mixers, our Concrete Division recently supplied concrete for the installation of a...
31/07/2026

Delivered using one of our volumetric mixers, our Concrete Division recently supplied concrete for the installation of a wheel wash facility. As the exact volume required couldn't be accurately calculated in advance, a volumetric mixer offered the ideal solution and enabled us to produce the precise amount of concrete required on site. The concrete produced by our volumetric mixers offers the same dependable performance and consistent quality as our traditional ready-mixed concrete delivered by drum mixers, while providing the added benefits of flexibility, reduced waste, and cost-effectiveness.

We are delighted to announce that the Q2 Construction Award has been presented to Barry Horn in recognition of his outst...
29/07/2026

We are delighted to announce that the Q2 Construction Award has been presented to Barry Horn in recognition of his outstanding commitment to health and safety at one of our Thirsk-based projects.

Barry consistently maintained a well-organised and impeccably managed site while overseeing a number of specialist contractors carrying out complex work activities. His exceptional attention to detail ensured that all project documentation was completed to a consistently high standard, demonstrating professionalism, diligence, and a strong commitment to safe working practices throughout the project.

Over the past few weeks, our Concrete Division has successfully completed a series of concrete pours at a local farm, al...
24/07/2026

Over the past few weeks, our Concrete Division has successfully completed a series of concrete pours at a local farm, all supplied from our Teesside Concrete Plant. The works have extended the existing yard area, with several pours requiring a rapid-setting, early-strength concrete incorporating steel replacement fibres. This specific mix enabled key areas of the yard to be brought into use ahead of the upcoming harvest.

Address

Moor Park, Moor Road
Leyburn
DL85LA

Alerts

Be the first to know and let us send you an email when Biker Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share