BMB Urban Solutions Ltd - Building Services

BMB Urban Solutions Ltd - Building Services We provide a professional, bespoke building service and offer complete solutions for all your building and renovation needs.
(1)

New steps going into a house we built 5 years ago. We will finish once a decision is made on the colour & materials for ...
18/10/2025

New steps going into a house we built 5 years ago. We will finish once a decision is made on the colour & materials for the balcony and steps.

Kitchen remodel for bretts MIL, stripped back, steel lifted,re-boarded,re-plumbed, re-wired, new plaster, kitchen fitted...
18/09/2025

Kitchen remodel for bretts MIL, stripped back, steel lifted,re-boarded,re-plumbed, re-wired, new plaster, kitchen fitted, tiled and new radiators

Busy few days on the green moor job. DPM in and 150mm insulation fitted ready for the underfloor heating. Then another t...
14/09/2025

Busy few days on the green moor job. DPM in and 150mm insulation fitted ready for the underfloor heating. Then another top job by ADH flooring, piped and screeded at two different levels to suit customers final floor finishes 😎

The farm is one step closer this week after an extremely long wait for windows from Lithuania πŸ‡±πŸ‡Ή. The task was to retain...
15/08/2025

The farm is one step closer this week after an extremely long wait for windows from Lithuania πŸ‡±πŸ‡Ή. The task was to retain and reuse the original stone to the front and one side of the property (visible from the track) and blend the colour through the other two sides using new and old masonry. Giving the original β€œold look” and a striking new look to the same property. Mission accomplished I think 😍😍😍😍😍

Busy few weeks on the green moor job. Parge coat and purple paint to make joist ends air tight. Airtight membrane on ins...
23/06/2025

Busy few weeks on the green moor job. Parge coat and purple paint to make joist ends air tight. Airtight membrane on inside of the roof, mezzanine floor construction. second floor, floor sheets down and first floor steel mesh and sub-floor concrete in with some temporary stairs also. Finally no ladders to climb πŸ˜‚πŸ˜‚ concrete floor in the barn too but forgot to take a pic πŸ€¦πŸ»β€β™‚οΈ.

Standing seam roof guys have been and worked their magic, lead work and ridge completed by ourselves. Balcony constructi...
25/04/2025

Standing seam roof guys have been and worked their magic, lead work and ridge completed by ourselves. Balcony construction next! πŸ˜ŽπŸ‘πŸ»

Busy few days readying the roof for standing seam sheets next week! Facia’s massive velux windows, ply lined and fully v...
11/04/2025

Busy few days readying the roof for standing seam sheets next week! Facia’s massive velux windows, ply lined and fully vented.

The last solar array installed today. Also 50ton removed from the barn lowering the internal levels to make way for a se...
23/03/2025

The last solar array installed today. Also 50ton removed from the barn lowering the internal levels to make way for a services room and live stock stable. Some property this is going to make 😎🫢

A challenging but rewarding week for us this week. We was tasked with Installing the flashing kits into the stone roof t...
28/02/2025

A challenging but rewarding week for us this week. We was tasked with Installing the flashing kits into the stone roof tiles for this huge solar array. The final product will see three separate arrays recessed into the roof with circa 13kw output. We are really happy with the finished item. Lead work and gutters to complete next week and the upper scaffolding can come down.

A little face lift project in Oughtibridge completed this week. Started as a garage conversion and ended as a complete r...
21/02/2025

A little face lift project in Oughtibridge completed this week. Started as a garage conversion and ended as a complete re vamp to include new kitchen, new bathroom new roof and a complete re plaster to every room. Thank you to everyone involved πŸ‘ŒπŸ™πŸ».

Upper roofs structure completed this week even with the weather β˜”οΈ 😩. Original Chimneys to reinstate next with the lower...
24/01/2025

Upper roofs structure completed this week even with the weather β˜”οΈ 😩. Original Chimneys to reinstate next with the lower roof sections to build. Phase 1 of this project is a water tight shell - not be long now πŸ‘Œ

Address

Oughtibridge

Website

Alerts

Be the first to know and let us send you an email when BMB Urban Solutions Ltd - Building Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to BMB Urban Solutions Ltd - Building Services:

Share