Thinking about a new driveway this year? Before you start getting quotes, here are a few things that catch homeowners off guard - and cost them money.
The timeline is longer than most people expect. From first enquiry to finished surface, you're typically looking at 4 to 12 weeks. Active installation is usually just 3 to 7 days - the rest is surveys, planning checks, scheduling, and curing time. Book 6 to 8 weeks ahead of when you want the work done. Reputable contractors fill up fast, especially through spring and summer.
The cheapest quote is rarely the best value. The price difference between a thorough job and a corner-cutting one is often a few hundred pounds. The difference in how long the driveway lasts can be 15 years. What you can't see - sub-base depth, drainage preparation, quality of materials - is exactly where savings are made on low quotes.
Check before you dig.If you're replacing a front driveway with an impermeable surface (standard tarmac or concrete) and it covers more than 5m², you may need permitted development approval. Permeable surfaces like resin-bound aggregate or permeable block paving are generally fine without planning permission. Worth a quick check before work starts, not after.
Three red flags to watch for in any quote:
✅ Cash-only payment requested upfront
✅ No fixed address or verifiable local presence
✅ Vague descriptions like "standard base" with no depth specified
We've put together a detailed 2026 guide covering the full project timeline, realistic costs by material, SuDS drainage rules in plain English, and what a properly scoped quote should look like. Read it here: