Reely Group Reely Group specialise in the installation of various types of cabling including DC, LC and MHV.

Our team recently completed a major electrical installation at Morley House, ensuring everything was up to standard and ...
03/04/2025

Our team recently completed a major electrical installation at Morley House, ensuring everything was up to standard and safely connected:

✅ Installed x4 240mm AWA cables, gland and terminated, and securely cleated.
✅ Worked with x12 500mm singles, gland and terminated, cleated, and carefully installed, with cable lengths ranging from 26m to 33m.

This project reflects our commitment to quality and precision in every detail. A huge thank you to our skilled team for their dedication and excellent work on-site!

Recently, our team attended a scheduled shutdown to rectify a previous installation that didn’t meet the required standa...
02/04/2025

Recently, our team attended a scheduled shutdown to rectify a previous installation that didn’t meet the required standards (not completed by us). We removed an old cable, installed 6 meters of 240mm 4c Reglanded cable, and carried out a gland and termination of the new cable. Additionally, we expertly jointed the new cable onto an existing 240mm 4c, ensuring everything was properly connected and up to code.

This project highlights our commitment to delivering high-quality, reliable solutions for our clients, no matter the challenge. A big thank you to our team for their hard work and professionalism on this task! 👏

28/03/2025

For all your cabling needs, you need… us!

Check out our work at www.reelygroup.co.uk ⚡️

We’re excited to share the successful completion of the first phase of works at Canary Wharf / Wood Wharf. Our team has ...
21/03/2025

We’re excited to share the successful completion of the first phase of works at Canary Wharf / Wood Wharf. Our team has installed 2x 150mm cables in parallel, alongside 70mm 4-core FP600 cables. The cables were carefully routed through Kemwell, secured with cleats and metal ties, and included all associated earths.

A massive thank you to everyone involved in this project for their hard work and dedication to getting this phase completed smoothly and safely!

See more at www.reelygroup.co.uk

We’re excited to share our recent work in partnership with Mark Draycott on a key project in Newcastle. Our team success...
21/03/2025

We’re excited to share our recent work in partnership with Mark Draycott on a key project in Newcastle. Our team successfully installed 335m of 185mm 3-core MV cabling, which played a crucial role in supplying power throughout the site.

Alongside the MV cabling, we also completed the installation of various LV cabling across roofs and risers, ensuring everything met the required standards.

A big thank you to everyone who contributed to this project! It was a great effort from all involved!

Finally got the green light to share these shots of the MV cables we installed, another crucial project delivered with p...
12/03/2025

Finally got the green light to share these shots of the MV cables we installed, another crucial project delivered with precision and expertise.

Big thanks to the team for their hard work on this one⚡🔧

See more at www.reelygroup.co.uk ⚡️

Finally able to share these shots of the energy centre we completed ⚡️16x 500mm singles at 110m each!A great project to ...
11/03/2025

Finally able to share these shots of the energy centre we completed ⚡️

16x 500mm singles at 110m each!

A great project to be a part of, and a real team effort. Every detail was carefully considered to ensure efficiency and reliability.

See more at www.reelygroup.co.uk ⚡️

Following on from our last update, we’re pleased to share that we’ve now completed phase one works at Bexhill Hospital! ...
05/03/2025

Following on from our last update, we’re pleased to share that we’ve now completed phase one works at Bexhill Hospital!

For this project, our team successfully glanced and terminated 12x 630mm 1C AWAs along with a 630mm CPC, ensuring a high-quality and reliable electrical infrastructure. A huge well done to everyone involved in making this happen!

Thanks to the team for their hard work and dedication on this job. On to the next!
See more at www.reelygroup.co.uk

We’ve just completed the installation of 12x630 HO7 singles at 26m each with a 120mm CPC for the incoming supply from UK...
21/02/2025

We’ve just completed the installation of 12x630 HO7 singles at 26m each with a 120mm CPC for the incoming supply from UKPN. A key milestone in the first phase of works at this exciting new hospital project!

Huge thanks to the team for their hard work and dedication on this one—fantastic effort all around! 👏⚡

Shoutout to everyone involved—appreciate your support in making this happen.

See more at www.reelygroup.co.uk ⚡️

Great to see two 240mm 4C cables plus CPC in place for a valued client, following on from the previous 150s we installed...
14/02/2025

Great to see two 240mm 4C cables plus CPC in place for a valued client, following on from the previous 150s we installed. 💪🔧

Our contract focused on these installations and the previous 150mm cables—other works pictured are not under our scope of work.

Always proud to deliver quality installations and support our clients with the best solutions! ✅