Howcroft Group Limited

Call Website

Howcroft Group Limited Howcroft Industrial Supplies (HIS) is an independent supplier of Maintenance, Repair and Overhaul (MRO) consumables, based in the heart of South Yorkshire.

Proud to be backing Rotherham & Barnsley Mind as official start and finish line sponsors for this year’s Mental Elf Fest...
22/10/2026

Proud to be backing Rotherham & Barnsley Mind as official start and finish line sponsors for this year’s Mental Elf Festive Fun Run! πŸŽ„πŸ‘Ÿ

Not only are we sponsoring the course, but the Howcroft team is lacing up their running shoes (and possibly digging out a few elf hats) to take on the 5k ourselves.

We’re throwing down the gauntlet to other local businesses across South Yorkshire β€” whether your squad runs, jogs, walks, or dances across the line, it’s all about raising vital funds and awareness for mental health support right here in our community.

The Details:
πŸ“ Gulliver’s Valley Resort, Rotherham

πŸ“… Saturday 21st November 2026

⏰ 12:00 PM

Get your team together and grab your tickets here: https://www.rbmind.co.uk/get-involved/mental-elf-festive-fun-run/

See you at the start line! πŸƒβ€β™‚οΈπŸ’¨

⚑ The Engineering Manager's Dilemma: 0.05mm or 5 Weeks of Downtime?It’s mid-shift on a Tuesday. A critical 75kW motor-to...
20/10/2026

⚑ The Engineering Manager's Dilemma: 0.05mm or 5 Weeks of Downtime?
It’s mid-shift on a Tuesday. A critical 75kW motor-to-gearbox drive coupling has shredded its elastomeric insert for the third time in two months.
The maintenance team can swap the spider element in 20 minutes with a straightedge alignment and get the line running immediately to hit shift quotas.
But laser alignment diagnostics show 0.18mm of angular misalignment and severe thermal growth potential once the gearbox reaches operating temperature (>75∘C) Doing a precision shimming and dynamic laser alignment will take the line down for another 90 minutes.

As Engineering Manager, what’s your directive?

πŸ”˜ Option A: Drop the new insert in, do a quick visual check, and run itβ€”schedule precision laser alignment for the weekend shutdown.

πŸ”˜ Option B: Take the 90-minute downtime hit nowβ€”shim the feet, dial in cold-offsets for thermal growth, and fix the root cause.

πŸ”˜ Option C: Upgrade the coupling type entirely (e.g., switch from elastomeric jaw to a steel disc or grid coupling to absorb misalignment).

πŸ”˜ Option D: Run the line at 75% load with real-time vibration monitoring until shift changeover.

Cast your vote below and tell us your logic in the comments: How does your engineering team balance immediate production pressures against root-cause precision? πŸ‘‡

🧹 Where’s the sweeping brush? (And why is someone spending 10 minutes looking for it?)In high-throughput warehousing, fo...
09/10/2026

🧹 Where’s the sweeping brush? (And why is someone spending 10 minutes looking for it?)

In high-throughput warehousing, food manufacturing, and production facilities, misplaced cleaning equipment isn't just an annoyance - it's wasted labour, an audit hazard, and a direct breakdown of 5S discipline.

Fresh off our fabrication line and packed for dispatch: a fully bespoke 5S Cleaning Station Shadow Board.

Designed, routed, and manufactured completely in-house to match the exact tool profiles, colour-coding requirements, and wall/racking footprints of the client's facility:

Zero Ambiguity: Dedicated silhouettes for every single brush, shovel, bucket, and wet-floor signβ€”one look tells shift supervisors exactly what’s missing before handover.

Heavy-Duty Construction: Built for industrial environments with durable, wipe-clean composite backing and robust stainless/composite mounting hooks.

Full Traceability & Compliance: Supports BRCGS, audit readiness, and cross-contamination zoning with site-specific colour coordination.

Whether you need standardized 5S hygiene stations or bespoke tool-control shadow boards for a maintenance workshop, we manufacture them locally to spec.

Need to audit or standardise shadow boards across your facility? Drop us a DM or contact the Howcroft team at [email protected].

πŸ› οΈ What's slowing down your maintenance team on the shop floor? Often, it’s not the major assetsβ€”it's the everyday consu...
07/10/2026

πŸ› οΈ What's slowing down your maintenance team on the shop floor? Often, it’s not the major assetsβ€”it's the everyday consumables and professional-grade tooling.

When technicians lack the right hand tools, power solutions, or reliable workshop consumables like adhesives, abrasives, and lubricants, productivity stalls.

Howcroft Group streamlines your entire utility and tool supply chain:

1) Professional-Grade Power & Hand Tools: Built to withstand heavy industrial environments without letting you down.
2) Universal Maintenance Consumables: Everything from specialist lubricants and adhesives to heavy-duty cleaning supplies and janitorial stock.
3) Consolidated Replenishment: Stop dealing with multiple purchase orders for everyday site supplies. One partner, full visibility.

Equip your team with the right tools for maximum uptime.

πŸ‘‰ Explore our complete range of professional tools and universal accessories: https://lnkd.in/gnUiH_FS

⚠️ Is your PPE programme BSIF-assured β€” or just "good enough"?Non-compliant safety kit is one of the easiest things to o...
28/09/2026

⚠️ Is your PPE programme BSIF-assured β€” or just "good enough"?

Non-compliant safety kit is one of the easiest things to overlook until an audit catches it. As a BSIF-registered supplier, we make sure every glove, boot and hi-vis item we supply meets the standard it claims to.

Cofra safety footwear. Portwest workwear. BlΓ₯klΓ€der flame resistant ppe. uvex eye, ear, hand and face protection. One supplier, four trusted brands, 27+ years getting it right for UK industry.

Due a PPE refresh before year-end? Drop us a message.

πŸš€ WE'RE HIRING: Signage Installer!Howcroft Group is growing, and we're on the lookout for a hands-on Signage Installer t...
22/09/2026

πŸš€ WE'RE HIRING: Signage Installer!

Howcroft Group is growing, and we're on the lookout for a hands-on Signage Installer to join our friendly team in Rotherham.

No experience? No problem β€” full training's provided. It's a varied, practical role: installing signage on-site, workshop prep, and pitching in on printing & embroidery when needed. Full, clean driving licence required.

πŸ’° Salary negotiable, up to Β£30,000 depending on experience, plus allowances for overnight stays, early starts & late finishes.

Apply now πŸ‘‰ howcroft.online/Careers

⚑ The Plant Manager's Dilemma: Fix the Leaks or Buy a Bigger Compressor?An ultrasound audit on a heavy packaging line ju...
16/09/2026

⚑ The Plant Manager's Dilemma: Fix the Leaks or Buy a Bigger Compressor?
An ultrasound audit on a heavy packaging line just flagged 38 discrete pneumatic leaks across fittings, FRLs, and valve manifoldsβ€”totaling an estimated Β£14,500/year in wasted baseline power.

Meanwhile, line pressure is dipping at the furthest drops during peak shifts, and operations is lobbying to spend Β£22k on an additional variable-speed compressor to "solve the pressure drop."

As lead maintenance or site manager, where do you direct the budget?

πŸ”˜ A) Fix the leaks during weekend downtime: Re-seal manifolds, replace push-in fittings, and recalibrate system baseline pressure.

πŸ”˜ B) Upgrade ring-main piping / add a local buffer receiver: Eliminate pressure drop at peak draw without adding compressor capacity.

πŸ”˜ C) Sign off on the additional compressor: Treat the symptoms fast so production never risks a low-pressure trip.

πŸ”˜ D) Restrict line pressure & zone the plant: Install automated shut-off isolation valves during non-production hours.

Drop your strategy in the comments. How does your plant balance fighting air leaks versus capital equipment upgrades? πŸ‘‡

πŸ”§ Spot the Failure Mode | Engineering DiagnosticMaintenance & Reliability Leads: Take a close look at this spherical rol...
02/09/2026

πŸ”§ Spot the Failure Mode | Engineering Diagnostic

Maintenance & Reliability Leads: Take a close look at this spherical roller bearing pulled during a planned overhaul. πŸ‘‡

The drive was running hot (>95^∘C) with audible rumble under heavy radial load. When stripped on the bench, our team found heavy outer ring raceway scoring, discoloured grease grease-purge, and bore clearance anomalies.

What is the primary root cause behind this premature failure?

πŸ”˜ A) Thermal Runaway from Over-Greasing (Churning & high internal pressure)
πŸ”˜ B) Incorrect Shaft Fit / Inadequate Radial Internal Clearance (RIC)
πŸ”˜ C) Severe Angular Misalignment (Skewed roller tracking)
πŸ”˜ D) Static Brinelling from Shock Loading

Cast your vote in the comments and drop the telltale diagnostic sign that caught your eye! πŸ”

(We’ll pin the full root cause analysis and clearance inspection tolerances tomorrow morning).

⚑ The Plant Manager's Dilemma: Run it or Pull it?It’s 3:30 PM on a Friday. A critical slurry transfer pump on your main ...
24/08/2026

⚑ The Plant Manager's Dilemma: Run it or Pull it?

It’s 3:30 PM on a Friday. A critical slurry transfer pump on your main processing line is showing a 15% drop in discharge pressure and elevated high-frequency vibration.

Production wants to push through the weekend shift to hit quota.

As the lead maintenance engineer on shift, what is your call?

πŸ”˜ A) Throttle line speed by 20% and set up 2-hourly vibration/thermal monitoring.

πŸ”˜ B) Immediate emergency shutdown to inspect the stator before catastrophic rotor damage occurs.

πŸ”˜ C) Flush the line & check for cavitation/suction blockages before making a call.

πŸ”˜ D) Ring your local MRO supplier for an emergency backup unit on standby before touching the line.

Cast your vote below and tell us your reasoning in the comments: How would your site manage the balance between production targets and catastrophic downtime? πŸ‘‡

Most signage delays don't happen on the install day. They happen three weeks before it  -  when the manufacturer realise...
20/08/2026

Most signage delays don't happen on the install day. They happen three weeks before it - when the manufacturer realises they outsourced the fabrication and nobody owns the problem.

We manufacture everything in-house in Rotherham. Illuminated letters, fret-cut sign trays, acrylic panels, metal fascias - all of it.

https://howcroft-signs.online

So when a retail fit-out moves by 10 days, we move with it. No subcontractor chain to untangle. No finger-pointing.

Just a straight answer on timing and a sign that arrives ready to go up.

Know someone in the middle of a retail or hospitality fit-out? Send this their way - it might save them a headache.

Address

Unit 9B Brookfields Way
Rotherham
S635DL

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+441709878282

Alerts

Be the first to know and let us send you an email when Howcroft Group Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share