Rear kitchen extension πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›Fully watertight Structural steels in production to open up into existing kitchen. πŸ“§epdbui...
07/09/2026

Rear kitchen extension πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

Fully watertight

Structural steels in production to open up into existing kitchen.

πŸ“§[email protected]

Rear kitchen extension with dormer loft conversion πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›Huge open plan kitchen/ dining room with separate utility room...
07/09/2026

Rear kitchen extension with dormer loft conversion πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

Huge open plan kitchen/ dining room with separate utility room.

Loft conversion into 2 new bedrooms with ensuite.

Plastering ongoing then into 2nd fix.

πŸ“§[email protected]

Rear extension and structural works πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›6m opening formed and black bifolds fittedBlack ensuite windowBlack bedroom b...
07/09/2026

Rear extension and structural works πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

6m opening formed and black bifolds fitted

Black ensuite window

Black bedroom bifolds

New sunroom extension with 2 sets Black bifolds

πŸ“§[email protected]

Full house renovation with wrap around extension and loft conversion πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›Existing house fully stripped while extensio...
07/09/2026

Full house renovation with wrap around extension and loft conversion πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

Existing house fully stripped while extension in with planning...

Rear structural steels fitted

New 1st floor joists and deck

Loft joists and deck

Loft staircase delivered

Ready for 1st fix throughout Existing then boardin

πŸ“§[email protected]

Rear extension πŸ§±πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›Ground floor shower room separate sunroom..Ready for brickwork tomorrow. Windows and doors ordere...
07/09/2026

Rear extension πŸ§±πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

Ground floor shower room separate sunroom..

Ready for brickwork tomorrow.
Windows and doors ordered

πŸ“§[email protected]

Double storey extension πŸ§±πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›Side extension over existing garage Rear ground floor extension office and utility room1...
07/09/2026

Double storey extension πŸ§±πŸ πŸ“πŸ“πŸ› πŸͺšπŸ”§πŸͺ›

Side extension over existing garage
Rear ground floor extension office and utility room
1st floor bedroom extension with ensuite.

Ready for tiling and then final fix to complete.

[email protected]

Kitchen extension πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺšπŸ’₯Week1 progress πŸ’₯Excavation βœ…οΈMuck awayβœ…οΈBuilding control inspection passed βœ…οΈShutters to drain...
28/07/2026

Kitchen extension πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺš

πŸ’₯Week1 progress πŸ’₯

Excavation βœ…οΈ
Muck awayβœ…οΈ
Building control inspection passed βœ…οΈ
Shutters to drainage βœ…οΈ
Concrete foundations βœ…οΈ
Masonry to dpc βœ…οΈ
Backfill βœ…οΈ
Floor preparation and Insulation βœ…οΈ
Building control inspection passed βœ…οΈ
Concrete floor slab with meshβœ…οΈ

Ready for Masonry tomorrow

Top teamwork πŸ€πŸ½πŸ‘πŸΎπŸ‘πŸ½

πŸ“§[email protected]

Kitchen rear extension,  14m dormer loft conversion πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺšKitchen now delivered getting fitted this week βœ”οΈLoft Fully i...
28/07/2026

Kitchen rear extension, 14m dormer loft conversion πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺš

Kitchen now delivered getting fitted this week βœ”οΈ

Loft Fully insulated onto plaster boards βœ”οΈ

Staircase in production..
Then windows, cladding, full new roof covering.

πŸ“§[email protected]

Full bungalow renovation and dormer loft conversion πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺšKitchen fitted βœ…οΈ2nd fix electrical βœ…οΈ2nd fix joinery βœ…οΈBathr...
28/07/2026

Full bungalow renovation and dormer loft conversion πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺš

Kitchen fitted βœ…οΈ

2nd fix electrical βœ…οΈ

2nd fix joinery βœ…οΈ

Bathroom and ensuite kit getting fitted βœ…οΈ

πŸ“§[email protected]

Full width rear extension πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺšπŸ’₯Week 2 progress..πŸ’₯Masonry complete βœ”οΈDrainage works complete βœ”οΈBuilding control inspec...
28/07/2026

Full width rear extension πŸ“πŸ—πŸ§±πŸ‘πŸͺ›πŸ”¨πŸͺš

πŸ’₯Week 2 progress..πŸ’₯

Masonry complete βœ”οΈ
Drainage works complete βœ”οΈ
Building control inspection passed βœ”οΈ
Roof structure complete βœ”οΈ
Felt and laths watertight βœ”οΈ

Ready for roof and floor insulation.

Windows in production

Velux windows and tile delivery due

Top teamwork πŸ€πŸ½πŸ‘πŸΎπŸ‘πŸ½πŸ’―

Happy customers πŸ™‚

πŸ“§[email protected]

Address

Spennymoor

Website

Alerts

Be the first to know and let us send you an email when EPD Building & Joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to EPD Building & Joinery:

Shortcuts

Share