EPD Building & Joinery

EPD Building & Joinery 28 years in the building trade, 8 years as a joiner, 20 years as a project manager overseeing projects upto Β£2m.
(1)

We can take care of your project from design to completion the whole process.
πŸ“§[email protected]

Rear sunroom extension πŸ—πŸ‘πŸ“πŸ”¨πŸͺšπŸͺ›πŸ§±6m bifolds in kitchen 1 tonne steel crane into new opening Bifolds delivered and fitted in...
14/06/2026

Rear sunroom extension πŸ—πŸ‘πŸ“πŸ”¨πŸͺšπŸͺ›πŸ§±

6m bifolds in kitchen

1 tonne steel crane into new opening

Bifolds delivered and fitted in new extension sunroom.

6m bifolds to fit

Sunroom Fully insulated

Ready for 1st fix, board and plaster

πŸ“§[email protected]

Rear kitchen extension/ dormer loft conversion πŸ‘πŸ“πŸ”¨πŸͺšπŸͺ›πŸ§±Brickwork 95%Roof structure completed Roof insulation fitted Ready ...
14/06/2026

Rear kitchen extension/ dormer loft conversion πŸ‘πŸ“πŸ”¨πŸͺšπŸͺ›πŸ§±

Brickwork 95%
Roof structure completed
Roof insulation fitted
Ready for sarna covering tomorrow

Windows and doors ordered in production

More structural steels in production

Top job guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½

πŸ“§[email protected]

Full width rear extension πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›Roof structure and covering complete Bifolds delivered and fitted Roof insulation fitte...
14/06/2026

Full width rear extension πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›

Roof structure and covering complete
Bifolds delivered and fitted
Roof insulation fitted

Next stage 6m structural opening πŸ—πŸ§±

πŸ“§[email protected]

Bungalow full renovation,  dormer loft conversion πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›All structural work complete βœ…οΈ1st fix electrical and plumbing ...
14/06/2026

Bungalow full renovation, dormer loft conversion πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›

All structural work complete βœ…οΈ
1st fix electrical and plumbing works βœ…οΈ
Plastering well on now βœ…οΈ
Then onto 2nd fix

Top job guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½

πŸ“§[email protected]

Kitchen extension πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›Internal structural openings Walls removed Utility room formedNew kitchen Fully plastered throu...
14/06/2026

Kitchen extension πŸ‘πŸ—πŸ§±πŸ“πŸ”¨πŸͺšπŸͺ›

Internal structural openings

Walls removed

Utility room formed

New kitchen

Fully plastered throughout

New radiators

Top teamwork lads πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½

πŸ“§[email protected]

Re roofing upper barn and lower store πŸ‘πŸ—πŸ§±πŸ“πŸͺšInternal insulation , boarded and plastered .Timber cladding πŸ”¨πŸͺšVery happy cus...
14/06/2026

Re roofing upper barn and lower store πŸ‘πŸ—πŸ§±πŸ“πŸͺš

Internal insulation , boarded and plastered .

Timber cladding πŸ”¨πŸͺš

Very happy customers πŸ˜€

Top teamwork guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½

πŸ“§[email protected]

Dormer loft conversion/ full bungalow renovation πŸ‘πŸ—πŸ§±πŸ“πŸͺšπŸ”¨πŸͺ›Dormer fully formed βœ…οΈSarna roof covering βœ…οΈLead flashingβœ…οΈNew e...
31/05/2026

Dormer loft conversion/ full bungalow renovation πŸ‘πŸ—πŸ§±πŸ“πŸͺšπŸ”¨πŸͺ›

Dormer fully formed βœ…οΈ
Sarna roof covering βœ…οΈ
Lead flashingβœ…οΈ
New existing valley formedβœ…οΈ
Existing tiles all made goodβœ…οΈ
Fully insulated βœ…οΈ
Building control inspection passed βœ…οΈ
1st fix electrical and plumbing works βœ…οΈ
Stud wallsβœ…οΈ
Boarded βœ…οΈ

Ready for plastering this week

Top teamwork guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½πŸ˜€

πŸ“§[email protected]

Rear sunroom extension πŸ—πŸ§±πŸ“πŸͺšπŸ”¨πŸ‘πŸͺ›Remove existing conservatory βœ”οΈExcavation foundations βœ”οΈBuilding control inspection passed...
31/05/2026

Rear sunroom extension πŸ—πŸ§±πŸ“πŸͺšπŸ”¨πŸ‘πŸͺ›

Remove existing conservatory βœ”οΈ
Excavation foundations βœ”οΈ
Building control inspection passed βœ”οΈ
Concrete foundations βœ”οΈ
Masonry to dpc βœ”οΈ
Floor preparation and Insulation βœ”οΈ
Building control inspection passed βœ”οΈ
Masonry complete βœ”οΈ
Roof structure completeβœ”οΈ
Sarna roof covering complete βœ”οΈ

Black bifolds in production πŸ–€

Top teamwork guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½πŸ˜€

πŸ“§[email protected]

Rear kitchen extension/ dormer loft conversion πŸ—πŸ§±πŸͺ›πŸ“πŸͺšπŸ”¨πŸ‘Demolition 2 existing extensionsExcavation Building control inspec...
31/05/2026

Rear kitchen extension/ dormer loft conversion πŸ—πŸ§±πŸͺ›πŸ“πŸͺšπŸ”¨πŸ‘

Demolition 2 existing extensions
Excavation
Building control inspection passed
Stone Backfill

Ready for concrete monday
Tuesday masonry to dpc
Wednesday floor prep and Insulation
Thursday inspection and concrete slab
Friday start masonry

Top teamwork guys πŸ‘πŸΎπŸ€πŸ½πŸ‘πŸ½

πŸ“§[email protected]

Garage conversion 🏑🧱πŸͺ›πŸ“πŸͺšπŸ”¨Fully complete Garage conversion,  including separate new utility room πŸ‘πŸ“§epdbuildingandjoinery@o...
31/05/2026

Garage conversion 🏑🧱πŸͺ›πŸ“πŸͺšπŸ”¨

Fully complete Garage conversion, including separate new utility room 🏑

πŸ“§[email protected]

Address

Spennymoor

Website

Alerts

Be the first to know and let us send you an email when EPD Building & Joinery posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to EPD Building & Joinery:

Share