Evolve

Evolve Your end-to-end construction partner, consultation, project management, demo and full construction

We've been quiet on here but it's because we've been so busy! Here's a few projects we've been providing consultancy for...
22/09/2023

We've been quiet on here but it's because we've been so busy! Here's a few projects we've been providing consultancy for over the last few months!







It's a digging footings kind of day!
28/08/2023

It's a digging footings kind of day!










Bit of muck shifting on a not so sunny Saturday 🤦Was a tight squeeze behind the fence with the panels out but the Terex ...
22/07/2023

Bit of muck shifting on a not so sunny Saturday 🤦

Was a tight squeeze behind the fence with the panels out but the Terex had no problems!









Block & Beam and the start of the base blockwork for the timber frame installation. Making the most of the sunny weather...
08/07/2023

Block & Beam and the start of the base blockwork for the timber frame installation. Making the most of the sunny weather!






Crushing, levelling, rolling! Laying out crushed rubble for this shed base. We've worked down to allow for a 200mm reinf...
01/07/2023

Crushing, levelling, rolling! Laying out crushed rubble for this shed base. We've worked down to allow for a 200mm reinforced concrete slab when the shed frame is erected. Our Leica laser makes levelling material easy work.











Little bit of work on a sunny Sunday morning using our taking off software to quantify blockwork requirements for a timb...
25/06/2023

Little bit of work on a sunny Sunday morning using our taking off software to quantify blockwork requirements for a timber framed house foundation.







Setting out for pile locations for a new build bungalow. Once the planning conditions are cleared we will be breaking gr...
17/06/2023

Setting out for pile locations for a new build bungalow. Once the planning conditions are cleared we will be breaking ground.

Thanks to






Marking out and digging pad foundation bases for a new shed today.
23/05/2023

Marking out and digging pad foundation bases for a new shed today.












Bit of Sunday grafting. 6x6 base, formwork and mesh ready for concrete pour next weekend. The timber framed garage will ...
23/04/2023

Bit of Sunday grafting. 6x6 base, formwork and mesh ready for concrete pour next weekend. The timber framed garage will look smart when installed.











A sunny Good Friday. Perfect for putting in ducts, water pipe and electric cable. We are putting in two empty ducts to f...
07/04/2023

A sunny Good Friday. Perfect for putting in ducts, water pipe and electric cable. We are putting in two empty ducts to future proof for the customer in their new home.










Site clearance is progressing well on this site, a former industrial unit, which will be the new location for two stunni...
16/03/2023

Site clearance is progressing well on this site, a former industrial unit, which will be the new location for two stunning four bedroom homes.

Planning Condition discharges have been submitted and the timber frame solution is in full design.









There's an absolute art to ditching work. John has been ditching since the 70's and we think he's pretty good at it!
20/02/2023

There's an absolute art to ditching work. John has been ditching since the 70's and we think he's pretty good at it!




Address

St Ives

Alerts

Be the first to know and let us send you an email when Evolve posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Featured

Share