Recent ongoing project installing a kingspan biodisc, pump station , pump main , large collection and storage manholes all installed as per consultants design and signed off by building control.
Final phase still to do,
powering system up via battery and generator till electric connection done which will include full road closure for road crossing. Removal of old septic tanks from gardens and piping houses into new system.
Followed by new water pipes and meters from the private artisan borehole which feds most of the village.