Pinnacle Renovation Projects Limited

  • Home
  • Pinnacle Renovation Projects Limited

Pinnacle Renovation Projects Limited We have been working since 2006, to meet the increasing demand for honest and reliable tradesmen in

We took this roof off a shared freehold building in Clapham because it had ‘roof spread’. We are installing steels and r...
12/11/2025

We took this roof off a shared freehold building in Clapham because it had ‘roof spread’. We are installing steels and rebuilding a new roof with membrane, ventilation and rockwool insulation.
We expect to have it completed by the end of the month.
Note that we have a tin roof (always!) on the scaffold which enables us to work in any weather.

Our loft project in Kensington is complete.The railings around the terrace were from a reclamation yard (we do just need...
26/09/2025

Our loft project in Kensington is complete.
The railings around the terrace were from a reclamation yard (we do just need to increase the height on them).
The wardrobe doors were also reclaimed together with the shower door and the basin stand in the bathroom.
We think it looks great! 😊

For the last year, Tom, our Managing Director, has been training hard and preparing to row the Atlantic Ocean, 3000 mile...
09/09/2025

For the last year, Tom, our Managing Director, has been training hard and preparing to row the Atlantic Ocean, 3000 miles from the Canary Islands to Antigua, setting off on 12th December.
He is in a team of 4 and they expect it to take somewhere between 35 and 40 days.
Tom is raising money for Cure Parkinson’s.
Link in the bio if you wish to donate.

The terrace tiles on our current Kensington loft has been laid on top of these adjustable pedestals. The water runs betw...
22/08/2025

The terrace tiles on our current Kensington loft has been laid on top of these adjustable pedestals.
The water runs between the tiles (no grout) and the tiles are anti slip.
The railings around the outside were bought, by the client, from a reclamation yard and we adapted them to fit.
The bricks, on the side of the conversion, are in fact ‘brick slips’ (not real bricks). The advantage of this is that they are much lighter and cheaper and we think they look really good! 😊
What do you think?

We have completed our loft conversion project in Clapham.Here are a handful of photos (taken by our client) of the finis...
18/07/2025

We have completed our loft conversion project in Clapham.
Here are a handful of photos (taken by our client) of the finished work.

The partitions are going up inside our Kensington loft project. Things are taking shape.
30/05/2025

The partitions are going up inside our Kensington loft project. Things are taking shape.

The staircase to the loft in Kensington is in! We have to raise the chimney hat sticks out but we shall then prop it up ...
23/05/2025

The staircase to the loft in Kensington is in! We have to raise the chimney hat sticks out but we shall then prop it up with a large steel.

The staircase is being fitted today at our loft project in Kensington. The insulation is in and the windows will be fitt...
22/05/2025

The staircase is being fitted today at our loft project in Kensington. The insulation is in and the windows will be fitted on 9th June.

Our loft conversion project in Clapham is progressing. The VELUX windows and the doors are in. The glass balustrade is b...
09/05/2025

Our loft conversion project in Clapham is progressing. The VELUX windows and the doors are in. The glass balustrade is being fitted around the terrace and then we will start building cupboards and painting.

The loft in Kensington is taking shape. The dormer window openings and leadwork are ready for the windows to be fitted. ...
09/05/2025

The loft in Kensington is taking shape. The dormer window openings and leadwork are ready for the windows to be fitted. We are about to break through the roof for the staircase which should be done in the next couple of weeks. Exciting times!

Building the framework for our loft project on Kensington….
04/04/2025

Building the framework for our loft project on Kensington….

The framework in Kensington is coming along. The weather is perfect. Long may it last!
04/04/2025

The framework in Kensington is coming along. The weather is perfect. Long may it last!

Address


Opening Hours

Monday 08:00 - 18:00
Tuesday 08:00 - 18:00
Wednesday 08:00 - 18:00
Thursday 08:00 - 18:00
Friday 08:00 - 18:00
Saturday 08:00 - 12:00

Alerts

Be the first to know and let us send you an email when Pinnacle Renovation Projects Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Pinnacle Renovation Projects Limited:

  • Want your business to be the top-listed Engineering Company?

Share