05/05/2025
Been a while since we posted anything so thought would update you with some of the jobs we have been doing over the last 6 months
Tar surfaced driveways and car parks to new build house site groundworks and various other civil engineering projects and streetscape contracts for highland council renewing and improving crossings and footpaths
We also now operate our new towable tar hot box for small tarmac jobs with the local fort william tar plant closing down this allows us to travel to inverness or oban and collect tarmac and when it arrives in fort william or surrounding areas its still kept at the required laying temperature which would not be possible with just a standard trailer