J Clarkson Building

  • Home
  • J Clarkson Building

J Clarkson Building Sole Trader based in Silsden. Covering all aspects of building. Free Quotes,
Email: [email protected]
Mobile:07464555134

Facebook and Instagram

Extension Completed for C&S Interiors ✅  Groundworks - Structural Work - Building Work all completed a few months ago.Al...
28/09/2026

Extension Completed for C&S Interiors ✅ Groundworks - Structural Work - Building Work all completed a few months ago.
All creating a lovely open space.

Garden Refurb 🚨🚨🚨Composite decking✅New Fence ✅New Lawn ✅Bringing this garden back to life, ready for a red hot British s...
21/05/2026

Garden Refurb 🚨🚨🚨

Composite decking✅
New Fence ✅
New Lawn ✅

Bringing this garden back to life, ready for a red hot British summer ☀️☀️☀️

A job completed last year 🧱Curved pergola ✅Curved patio area ✅Cladding ✅Just waiting on the weather now ☀️
23/01/2026

A job completed last year 🧱

Curved pergola ✅
Curved patio area ✅
Cladding ✅

Just waiting on the weather now ☀️

Patio Completed last month:-indian stone flags laid-rehardcored up-new stop tap cover installed-new step built.✅✅✅✅
05/10/2025

Patio Completed last month:

-indian stone flags laid
-rehardcored up
-new stop tap cover installed
-new step built.

✅✅✅✅

Job completed for  Replacing a door opening and creating a new window space ready to be rendered and new window installe...
08/07/2025

Job completed for

Replacing a door opening and creating a new window space ready to be rendered and new window installed.

Working for  down in Northampton at GXO  in January, installing of 6 EV blocks for 12 EV Chargers.75m trench dug out at ...
04/07/2025

Working for down in Northampton at GXO in January, installing of 6 EV blocks for 12 EV Chargers.

75m trench dug out at atleast 450mm in depth, laying armoured and data cable covered with sand and warning tape, to comply with regulation. Consisting of going under two roads one using preinstalled ducting under and concrete road, the second under a block paving entrance to the car park.

In addition the trench was dug through bushes and eventually came out at the other side where we installed a concrete pad for a substation.

Following on from the substation we then installed 6 EV blocks to take 12 EV chargers in total, cable covered with 100mm ducting allowing for easy access for future cable laying.

My new business page with a few photos of past projects.Feel free to get in touch for a free quote through:Email: joshcl...
02/07/2025

My new business page with a few photos of past projects.

Feel free to get in touch for a free quote through:

Email: [email protected]
Mob: 07464555134

Address


Website

Alerts

Be the first to know and let us send you an email when J Clarkson Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

  • Want your business to be the top-listed engineering company?

Share