19/08/2026
A selection of projects completed over the past few weeks:
Installation of a 2" 5D vacuum line.
Fabrication and installation of a new pivoting griddle plate.
Installation of 16 new blowdown tubes, mirror welded in position during a scheduled shutdown.
Installation of a pump and associated 2" pipework.
Currently working on a local site, assisting with the installation of two new 4" water lines.
We take pride in delivering high-quality workmanship across a range of fabrication, pipework and installation projects.