Iemodu future house

Iemodu future house Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Iemodu future house, Construction Company, Ballyhale, Kilkenny.

Extendable modular house / tree Tiny cabin house / space capsule
Sustainable modular & expandable houses 🌿
Women-founded brand from China 🇨🇳, based in Ireland 🇮🇪
Fast installation · Eco-living · Affordable design
www.iemodu.com

What makes us different?Professionalism gets the job done.Attention to detail makes it better.But care is what makes the...
25/08/2026

What makes us different?

Professionalism gets the job done.
Attention to detail makes it better.
But care is what makes the difference. 🌿

One of the challenges with traditional construction on site is achieving millimetre-level precision consistently. Weather, site conditions, different trades and the realities of construction can all affect the final result.

With off-site manufacturing, we can control much more of the process in a factory environment — from measurements and materials to assembly and finishing — before the building arrives on site.

But precision alone isn’t enough.

Because ultimately, what matters most is the person responsible for delivering your project.

The person who checks the details.

The person who notices when something isn’t quite right.

The person who doesn’t simply say, “That’s good enough.”

At IEMODU, we believe every detail deserves attention — not because someone is watching, but because we care about the finished home as much as the person who will live in it.

Professional.
Precise.
Responsible.

And, most importantly —

Made with care. ❤️

AttentionToDetail IrishConstruction BuiltWithCare HousingInnovation Ireland

New design for the prefab extension house Never stop dreaming about your dreams house living in everywhere you want  thi...
25/08/2026

New design for the prefab extension house
Never stop dreaming about your dreams house
living in everywhere you want

this new design will save your 30% delivery cost

06/08/2026

Q2 : how long does it takes to complete a modular house?

Question 2: How long does it normally take to complete a modular house?Once the design, technical specification and orde...
06/08/2026

Question 2: How long does it normally take to complete a modular house?

Once the design, technical specification and order have been confirmed, the indicative timeline is:

Production by the selected partner factory: 30–45 working days;

International shipping: approximately 50–60 days;

Customs clearance and delivery to the customer’s address: approximately 4–7 days;

For a turnkey project, on-site installation and finishing normally require an additional 2–3 weeks.

For experienced DIY buyers and dealers arranging their own assembly, the usual timeframe from order confirmation to delivery is approximately 3.5–4.5 months.

For retail customers requiring a turnkey service coordinated by IEMODU, the complete project will normally take approximately 4–5.5 months.

Actual times depend on the building size, customisation, material availability, shipping route, customs clearance, weather, site access and installation conditions. Planning, building-control procedures, foundations and utility connections must be assessed separately and may extend the overall project schedule.

IEMODU is an Irish-registered trading and supply-coordination company with people based in China and Ireland. We coordinate partner suppliers, order progress, international shipping, delivery and local installation resources. We are not the manufacturer.

Send us your project location, intended use, approximate size and preferred service option for a more accurate delivery estimate.

觀看、關注並探索更多熱門內容。

05/08/2026

05/08/2026

# IEMODU

After living in our modular house for 1 year in Kilkenny, we will answer any questions you have. Please ask in comments ...
01/08/2026

After living in our modular house for 1 year in Kilkenny, we will answer any questions you have. Please ask in comments below..

觀看、關注並探索更多熱門內容。

01/08/2026

After living in our modular house for 1 year in Kilkenny, we will answer any questions you have. Please ask in comments below…

S90 Space capsule, all prefab in factory after contact with electrical panel could use right the wayAluminum alloy singl...
22/07/2026

S90 Space capsule, all prefab in factory after contact with electrical panel could use right the way
Aluminum alloy single panel 2.5mm thick (national standard), with metal fluorocarbon baked paint finish
size:L11500 x W3300x H3200(mm)
38SQM
Approximate total weight:9.6T
PM get final price delivery to your door

觀看、關注並探索更多熱門內容。

S90 Space capsule , all prefab in factory after contact with electrical panel could use right the way Aluminum alloy sin...
22/07/2026

S90 Space capsule , all prefab in factory after contact with electrical panel could use right the way

Aluminum alloy single panel 2.5mm thick (national standard), with metal fluorocarbon baked paint finish

size:L11500 x W3300x H3200(mm)
38SQM
Approximate total weight:9.6T

PM get final price delivery to your door 🌷

Address

Ballyhale
Kilkenny
X91HY75

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Iemodu future house posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share