12/09/2025
🚧 Project Complete – Rapid-Build Modular Office for a Leading Construction Business 🚧
FitzMac is proud to have delivered this high-spec, sustainable modular office building, tailored to meet the needs of this busy construction business – all with minimal disruption to their day-to-day operations.
🏢 Project Highlights:
• 📐 4 Separate Modules delivering 1,500 sq. ft. of floor area.
• Delivered and installed all in one Day.
• 🚻 Toilets, changing rooms, canteen, offices, and a meeting room
• ♻️ 88% PMV (Pre-Manufactured Value) – 88% of the building was completed off-site
• 🏗️ Rapid build, delivered with minimal disruption on-site
• 🏅 High-end internal & external finishes
• 🌍 A-Rated, low energy & sustainable design
• ❄️ Air-to-Air System – for efficient, comfortable climate control using the latest in air-conditioning technology
This is modular done right – delivering quality, speed, and sustainability in one efficient package.
➡️ Thinking modular? Let’s talk about how FitzMac can deliver for your business.