16/07/2026
1. EX*****ON WORK SEQUENCE
Step 1: Layout & Marking
Step 2: Civil Work
Step 3: Pipe Laying
Cold Water: CPVC/PPR Concealed
Hot Water: CPVC SDR 11 / PPR PN25
Drainage: SWR Pipe with proper slope 1:48
Testing: 24hr Hydrotest @ 10 kg/cm2 Step 4: Sanitary Installation
WC, Basin, Tap fitting, Silicone sealing
Special Systems
1. Hot Water Line - Geyser/Solar/Heat Pump
2. Rain Water Harvesting - Pipe + Pit
3. Fire Hydrant + Sprinkler - GI Pipe Class C
4. STP / ETP - Commercial Project final Water test
Step 4: Pump Room
Pump, Panel, Pressure tank install,trail run
Step 5: Handover
As-built drawing
Testing report
๐ฐ Professional Plumbing Solutions by Ehaan Power Corporation
We deliver high-quality, reliable, and efficient plumbing systems for all types of projects. From planning to ex*****on, our expert team ensures precision, durability, and performance at every step.
๐ง Our Plumbing Services Include:
โ๏ธ Cold & Hot Water Pipeline Installation (CPVC / PPR)
โ๏ธ Drainage Systems with Proper Slope & Design
โ๏ธ Sanitary Fittings โ WC, Basin, Taps & Accessories
โ๏ธ Hydro Testing & Quality Assurance
โ๏ธ Pump Room Installation & Commissioning
๐ข We Serve:
โข Residential Projects โ Flats & Villas
โข Commercial Buildings โ Offices, Malls, Hospitals
โข Industrial Projects โ Factories & Plants
๐ง Specialized Systems:
โ๏ธ Rainwater Harvesting
โ๏ธ Hot Water Systems (Geyser / Solar / Heat Pump)
โ๏ธ Fire Hydrant & Sprinkler Integration
โ๏ธ STP / ETP Solutions
โ
Govt. Approved | Expert Engineers | Timely Ex*****on
๐ Contact: 8210339670
๐ง Email: [email protected]
๐ Website: ehaangroup.com
๐ Follow us for more project updates and engineering solutions!