Steel Works & Power Engineers Pvt. Ltd.

Call Website Contact the business

Steel Works & Power Engineers  Pvt. Ltd. Transforming steel into lasting infrastructural structures. We design, fabricate, manufacture and erect. Tunnel Lining Form works.

2.

Experts in Steel Bridges, Formwork System, PEBs and steel construction. We specialize in“Design, Fabrication, Supply, Er****on, Testing and Commissioning of the following Steel Structures”:

1. Steel Bridges including Single/Multi Spans Truss/ Plate Girder/ Box Girder.

3. Hydro Mechanical Works including Gates, Stop log, Trash Rack, Hoists, etc.

4. Penstocks and Pressure Shaft Liners

5. Silos and Inundation Bins

6. Entry/Exit Structures, Shelters and Roof Trusses.

7. Industrial Structure and other Miscellaneous Fabrication like Columns, Beams, Crane Girders, Decking Plates, Shuttering, etc

We are one of the reputed and well established companies in this field of business from the last 28 years. Quality, Safety & Timely Completion
is an integral part of our Work Ethics and hallmark of our organization.

🏗️ Precision in Every Span. Strength in Every Structure.Steel Works proudly presents the trial assembly of a 62-metre Op...
13/10/2026

🏗️ Precision in Every Span. Strength in Every Structure.

Steel Works proudly presents the trial assembly of a 62-metre Open Web Girder for a Rail Overbridge (ROB) across the Howrah–Mumbai Railway Line.

📍 Project Location: Near Jairam Nagar Railway Station Yard, Masturi–Seepat Road
📐 Key Specifications:
▪️ Length: 62 m (Centre to Centre)
▪️ Width: 16.3 m (Centre to Centre)
▪️ Height: 8.1 m (Centre to Centre)

This project showcases our expertise in heavy structural steel fabrication, precision engineering and complex bridge assembly, supporting the development of India’s railway infrastructure.

At Steel Works, we continue to build on strength and deliver engineering excellence, one structure at a time.

STEEL WORKS
Built on Strength. Shaping a Sustainable Tomorrow.

StructuralSteel BridgeEngineering InfrastructureDevelopment MakeInIndia

🏗️ Precision in Every Span. Strength in Every Structure.Steel Works proudly presents the trial assembly of a 62-metre Op...
13/10/2026

🏗️ Precision in Every Span. Strength in Every Structure.

Steel Works proudly presents the trial assembly of a 62-metre Open Web Girder for a Rail Overbridge (ROB) across the Howrah–Mumbai Railway Line.

📍 Project Location: Near Jairam Nagar Railway Station Yard, Masturi–Seepat Road
📐 Key Specifications:
▪️ Length: 62 m (Centre to Centre)
▪️ Width: 16.3 m (Centre to Centre)
▪️ Height: 8.1 m (Centre to Centre)

This project showcases our expertise in heavy structural steel fabrication, precision engineering and complex bridge assembly, supporting the development of India’s railway infrastructure.

At Steel Works, we continue to build on strength and deliver engineering excellence, one structure at a time.

STEEL WORKS
Built on Strength. Shaping a Sustainable Tomorrow.

4 × 47.4m of composite girder, launched at a 47° skew on the Delhi-Amritsar Katra Expressway. 🌉Precision steel for India...
13/10/2026

4 × 47.4m of composite girder, launched at a 47° skew on the Delhi-Amritsar Katra Expressway. 🌉
Precision steel for India’s highways.
Planning a bridge or flyover? Let’s talk.
📞 +91 9733 312 122 | 📧 [email protected] | 🌐 https://vist.ly/5n5e2

The future isn't built overnight. 🏗️➡️🏭From raw steel frames to fully operational facilities — every great structure sta...
08/10/2026

The future isn't built overnight. 🏗️➡️🏭

From raw steel frames to fully operational facilities — every great structure starts with a vision, and gets there through precision, patience, and persistence.

📞 +91 9733 312 122 | 📧 [email protected] | 🌐 https://vist.ly/5mgu6

Precision. Collaboration. Engineering Excellence.Steel Works proudly presents the Trial Assembly of the 165 m Mahalaxmi ...
07/10/2026

Precision. Collaboration. Engineering Excellence.

Steel Works proudly presents the Trial Assembly of the 165 m Mahalaxmi Cable Stayed ROB, covering Segments G11 to G15, carried out at our Alwar Unit.

The trial assembly was checked by RITES and BMC, reflecting our commitment to precision, quality and adherence to project requirements.

This milestone showcases Steel Works’ capability in heavy structural steel fabrication, precision assembly and complex bridge structures for landmark infrastructure projects.

Project: Mahalaxmi Cable Stayed ROB, Mumbai

Length: 165 m

Segments: G11 to G15

Checked by: RITES & BMC

Location: Steel Works – Alwar Unit

Steel Works — Built on Strength. Shaping a Sustainable Tomorrow.

🚇 Project Update | Tunnel Lining Formwork CommissionedSteel Works is proud to announce the successful manufacturing and ...
06/10/2026

🚇 Project Update | Tunnel Lining Formwork Commissioned

Steel Works is proud to announce the successful manufacturing and commissioning of tunnel lining formwork for the Wardha–Nanded New Broad Gauge Line Project.

Engineered for precision, durability and efficient tunnel construction, the formwork reflects our capabilities in delivering specialised steel solutions for major railway infrastructure projects.

Project: Wardha–Nanded New Broad Gauge Line
Client: Dhorajia Constructions (Pvt.) Ltd.
Manufactured & Commissioned by: Steel Works

📐 Key Specifications
• Tunnel Diameter: 8.364 m
• Formwork Length: 12,000 mm
• Longitudinal Module: 1,500 mm segments
• Tunnel Geometry: R4150, R5700 & R3587

From engineering and fabrication to site commissioning, Steel Works continues to build on strength and deliver precision-driven infrastructure solutions.

People | Projects | Partnerships | A Stronger India

BroadGauge RailwayProjects SteelFabrication EngineeringExcellence Infrastructure MakeInIndia BuiltOnStrength

🚇 Project Update | Tunnel Lining Formwork CommissionedSteel Works is proud to announce the successful manufacturing and ...
06/10/2026

🚇 Project Update | Tunnel Lining Formwork Commissioned

Steel Works is proud to announce the successful manufacturing and commissioning of tunnel lining formwork for the Wardha–Nanded New Broad Gauge Line Project.

Engineered for precision, durability and efficient tunnel construction, the formwork reflects our capabilities in delivering specialised steel solutions for major railway infrastructure projects.

Project: Wardha–Nanded New Broad Gauge Line
Client: Dhorajia Constructions (Pvt.) Ltd.
Manufactured & Commissioned by: Steel Works

📐 Key Specifications
• Tunnel Diameter: 8.364 m
• Formwork Length: 12,000 mm
• Longitudinal Module: 1,500 mm segments
• Tunnel Geometry: R4150, R5700 & R3587

From engineering and fabrication to site commissioning, Steel Works continues to build on strength and deliver precision-driven infrastructure solutions.

People | Projects | Partnerships | A Stronger India

30/09/2026
Did you know? 🤔 The iconic Howrah Bridge has zero nuts, bolts, or screws — yet carries nearly 1 lakh vehicles and 1.5 la...
28/09/2026

Did you know? 🤔
The iconic Howrah Bridge has zero nuts, bolts, or screws — yet carries nearly 1 lakh vehicles and 1.5 lakh pedestrians every day across the Hooghly.
The secret? Pure riveted steel engineering, a testament to how far good craftsmanship can go.

📞 +91 9733 312 122 | 📧 [email protected] | 🌐 https://vist.ly/5k4cw

Where there's a business, we build the space to grow. 🏗️From foundation to framework, Steelworks engineers structures th...
26/09/2026

Where there's a business, we build the space to grow. 🏗️
From foundation to framework, Steelworks engineers structures that give industries the room to expand — strong, scalable, and built to last.

📞 +91 9733 312 122 | 📧 [email protected] | 🌐 https://vist.ly/5jxai

Address

SF 05, JMD Galleria, Sohna Road, Sector 48
Gurugram
121008

Alerts

Be the first to know and let us send you an email when Steel Works & Power Engineers Pvt. Ltd. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Steel Works & Power Engineers Pvt. Ltd.:

Shortcuts

Share