24/04/2023
There are many facts which have to be implemented while making a builder floor and each has to be supervised so that it is technically perfect. The columns are designed by the structural engineer and they have to be laid according to specifications. The shuttering, the reinforcement - which steel are you using (in this case RATHI EXCEL) the Ready Mix Concrete has to be of the proper grade (M25) and proper thickness (6 inches) and later a sample should be tested for proper strength and ingredients