Zaydavi engineering Limited

Zaydavi engineering Limited A registered electrical engineering firm in kenya ,licensed by National Construction Authority N.C.A

0702938616/0101216391 Zaydavi Engineering limited
31/05/2026

0702938616/0101216391 Zaydavi Engineering limited

27/05/2026
27/05/2026

One of its kind from us .0702938616/0101216391

๐Ÿ—๏ธ A Multi-Storey Residential Projectโ€ฆ where engineering vision becomes a precise reality.We are developing a modern fiv...
22/05/2026

๐Ÿ—๏ธ A Multi-Storey Residential Projectโ€ฆ where engineering vision becomes a precise reality.
We are developing a modern five-storey residential building under the highest standards of quality and safety, using advanced structural systems and a contemporary construction approach that reflects modern urban development.

๐Ÿ‘ทโ€โ™€๏ธ From on-site engineering supervision to detailed ex*****on monitoring, the project team ensures precision, quality, and sustainability at every construction stage.

๐Ÿ“Œ A project that combines: โœ”๏ธ Engineering precision
โœ”๏ธ High-quality ex*****on
โœ”๏ธ Occupational safety
โœ”๏ธ Modern construction efficiency

# 0702938616/ 0101216391

TheEngineers around 0702938616/0101216391
30/04/2026

TheEngineers around 0702938616/0101216391

Rework Prevention in construction and civil engineering works.Involves planning,supervision, clear communication and str...
09/04/2026

Rework Prevention in construction and civil engineering works.

Involves planning,supervision, clear communication and strict quality control ensuring work is done correctly the first time.

Strategies for preventing Rework:
1. Rigorous preparation and planning
2. Active site supervision and monitoring
3. Material quality control
4. Documentation and technology
5. Managing workforce safety.

"DO IT RIGHT THE FIRST TIME."










# Electrical Engineering
0702939616/0101216391

Panoramic view ๐Ÿ˜ŠFormwork 98% โœ”๏ธ ๐Ÿ‘
05/04/2026

Panoramic view ๐Ÿ˜Š
Formwork 98% โœ”๏ธ ๐Ÿ‘

This image provides a detailed, step-by-step guide on how to check the vertical alignment, or plumb, of a concrete colum...
01/04/2026

This image provides a detailed, step-by-step guide on how to check the vertical alignment, or plumb, of a concrete column during construction. The process is crucial for ensuring the accuracy and structural stability of the building.

The guide outlines five key steps:

1. Plumb Bob Check : This traditional method uses a plumb bob, a weight suspended from a string, to verify verticality. Gravity ensures the plumb bob hangs in a perfectly vertical line, and any deviation from this line indicates misalignment of the column.

2. Spirit Level : A spirit level is placed against the surface of the column formwork. The air bubble within the vial of the spirit level indicates whether the surface is perfectly vertical. Adjustments are made to the formwork until the bubble is centered, signifying a vertical alignment.

3. Laser Level : This modern technique employs a laser level to project a straight vertical beam along the column. It offers high precision and allows for rapid checking of verticality, even over greater heights compared to traditional tools.

4. Axis Measurement : This step involves checking the column's position at its base using measuring tools. Proper alignment with layout markings is essential to ensure the column is correctly positioned according to the structural plan.

5. Adjust Wooden Formwork : The final step involves adjusting the wooden formwork using supports and braces. Workers tighten or loosen these supports to achieve perfect alignment of the column before the concrete is poured, ensuring overall accuracy.

๐ŸŒ‰ Bridge Construction โ€“ Structural Works in ProgressA technical snapshot of a bridge under construction, highlighting ke...
01/04/2026

๐ŸŒ‰ Bridge Construction โ€“ Structural Works in Progress

A technical snapshot of a bridge under construction, highlighting key structural components and engineering coordination on site.

๐Ÿ”น Main features:

* Reinforced concrete piers, beams, and deck slab
* Detailed reinforcement (rebar sizes and spacing)
* Expansion joints for structural movement
* Integration of MEP systems (drainage, electrical conduits)
* Dimension lines and level references ensuring accuracy

Strong design and precise ex*****on are essential for durability and safety in infrastructure projects.


Engr Duke

Address

4495
Kitale

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Sunday 09:00 - 17:00

Telephone

+254702938616

Alerts

Be the first to know and let us send you an email when Zaydavi engineering Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Zaydavi engineering Limited:

Share

Category