29/05/2026
Please follow KERUI Petroleum & Gas for more information on smart and low-carbon energy solutions.
The desert oil and gas extraction areas have complex working conditions and long relocation distances. Conventional drilling rigs face issues such as complicated disassembly, time-consuming assembly, and long cross-region relocation cycles, which can easily affect the overall project schedule.
For clients in the Gulf region, KERUI has developed and manufactured 1500HP desert fast-moving drilling rig. The rig's derrick base can be transported upright as a whole, without the need for disassembly; the top section of the derrick features a foldable design, making it easier to pass under high-voltage lines; the equipment uses a fully modular wheel-towing design, reducing the relocation time of a single rig from the conventional 10 days to as short as 3 days; the top drive integrated control integrates the top drive VFD with the rig VFD, making operation more convenient. Currently, multiple sets of drilling rigs have been continuously performing drilling operations in client oil fields, with excellent operational results. For more detailed information, please DM us.