Horn Construction

Horn Construction ဒီဇိုင်းဆွဲပေးတယ်၊ အိမ်ဆောက်ပေးတယ်

Types of Iron Beams- H-Beam    - Wide flanges and thick web    - Excellent load-bearing capacity    - Used in bridges, h...
06/09/2025

Types of Iron Beams

- H-Beam
- Wide flanges and thick web
- Excellent load-bearing capacity
- Used in bridges, heavy structures

- I-Beam
- Narrow flanges and thinner web
- Economical and efficient for bending
- Common in floor joists and frames

- Z-Steel
- Zigzag profile
- Lightweight and flexible
- Ideal for roofing and cladding

- Channel (U-Beam)
- U-shaped cross-section
- Used for wall studs and bracing
- Easy to bolt or weld

- Angle (L-Beam)
- Right-angle profile
- Perfect for corner reinforcements
- Used in trusses and brackets

- C-Channel
- Similar to Channel but asymmetrical
- Used in purlins and girts
- Offers directional strength

- Rail Steel
- Specialized for railway tracks
- Heavy-duty and durable
- Used in transportation infrastructure

---

🏗️ Types of Iron Columns

- Square Bar
- Solid square cross-section
- Used in posts and supports
- Strong and compact

- Round Bar
- Solid cylindrical shape
- Used in shafts, pins, and reinforcements
- Smooth and versatile

- Pipe Column
- Hollow circular section
- Lightweight and easy to install
- Used in scaffolding and vertical supports

- Box Column
- Hollow square or rectangular section
- High torsional resistance
- Used in modular and curtain wall systems

- Composite Column
- Combination of steel and concrete
- High strength and fire resistance
- Ideal for high-rise buildings


#ဆောက်လုပ်ရေး #နည်းပညာ

Cost of Construction=================Construction cost is divided into different categories that together determine the ...
31/08/2025

Cost of Construction
=================

Construction cost is divided into different categories that together determine the overall project budget.

Below is a breakdown of the main components:

• Materials (55-60%): The largest portion of construction cost goes into materials such as cement, bricks, steel, aggregates, wood, paints, etc.

• Labour (25-30%): Covers wages of skilled and unskilled workers including masons, carpenters, electricians, plumbers, and helpers.

• Professional Fees (5-10%): This includes fees for architects, engineers,project managers, and consultants.

• Permissions & Legal (2-5%): Covers statutory approvals, government permissions, licenses, and legal documentation.

• Contingencies (5-10%): Allocated for unforeseen expenses, design changes, or price fluctuations in materials and labour.

By understanding this breakdown, builders and homeowners can better manage their budget and ensure cost-effective construction planning.



Abbreviations used in Civil Engineering:DPC - Damp proof course.RCC - Reinforced cement concrete.RBC - Reinforced Brick ...
28/08/2025

Abbreviations used in Civil Engineering:

DPC - Damp proof course.

RCC - Reinforced cement concrete.

RBC - Reinforced Brick concrete.

R.B.W - Reinforced brick work.

C.I.Sheet - Corrugated Iron sheet.

C.I.Pipe - Cast iron pipe.

NCF - Neat cement finishing.

SWG - Standard wire gauge.

MB - Measurement book.

GP - Ground plane.

VP - Vertical plane.

HP - Horizontal plane.

CP - Cement plaster.

LC - Lime concrete.

CC - Cement concrete.

AC - Asbestos cement.

CS - Comparative statement.

PERT - Programme Evaluation and Review Technique.

CPM - Critical path method.

USD - Ultimate strength design.

W.S.D - Working stress design.

PL - Plinth level

𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 မှ ဒီဇိုင်းပြုစုဖန်တီးပေးခဲ့ပြီး တည်ဆောက်ပြီးစီးသွားသည့် RCC နှစ်ထပ် မော်ဒန်မိသားစုနေအိမ်လေး😍ပဲခူးတိုင...
08/03/2025

𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 မှ ဒီဇိုင်းပြုစုဖန်တီးပေးခဲ့ပြီး တည်ဆောက်ပြီးစီးသွားသည့် RCC နှစ်ထပ် မော်ဒန်မိသားစုနေအိမ်လေး😍

ပဲခူးတိုင်းဒေသကြီး၊ ဝေါမြို့မှ အိမ်ရှင် အစ်ကိုဝဏ္ဏနှင့်မိသားစုအား စိတ်ချမ်းသာ၊ ကိုယ်ကျန်းမာရှိပါစေကြောင်း နှင့် ဥစ္စာစီးပွား တိုးတက်ကြီးပွားကြပါစေကြောင်း 𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻 မှ ဆုတောင်းမေတ္တာပို့သလျက်-

အစဉ်လေးစားချစ်ခင်စွာဖြင့်-

Htet Phyoe Aung (BE-Civil)
𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻
☎️Phone🔵Viber: 09 - 958 758 758

မူရင်းဒီဇိုင်းလင့်(ခ်)
https://www.facebook.com/share/p/18wnJunWNj/

#အိမ်ဒီဇိုင်း #အိမ်ပုံစံ #အာခီဒီဇိုင်း

Feb 8, 2025 / သံဈေးHRB 400 [Local]========================10mm 5kg (4JY/4YL) - 2,280,000 MMK12mm 6.1kg (4FG/4MS) -2,150,...
08/02/2025

Feb 8, 2025 / သံဈေး

HRB 400 [Local]
========================
10mm 5kg (4JY/4YL) - 2,280,000 MMK
12mm 6.1kg (4FG/4MS) -2,150,000 MMK
16mm 13kg (4JY/4FG) - 2,450,000 MMK
18mm 18kg(4jy/4FG) - 2,650,000 MMK
20mm 20kg (4JY) - 2,600,000 MMK

HRB 400 [Exp]
========================
10mm 5kg(5M) - 2,650,000 MMK
10mm 5.5kg(5M) - 3,200,000 MMK
12mm 7.2kg(5M/UIS/41300jy) - 2,430,000 MMK
16mm 13kg(RKS) - 2,680,000 MMK
16mm 14kg(41300jy) - 2,810,000 MMK
18mm 18.5kg(Rouhina) - 2,870,000 MMK
20mm 22kg (RKS) - 2,810,000 MMK

========================
6.5mm coil - 4,400,000 MMK
8mm coil - 4,400,000 MMK
18G - 140,000 MMM
========================

အချိန်နှင့်အမျှ (အပြောင်းအလွဲရှိမည်)

𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻
☎️Phone🔵Viber: 09 - 958 758 758

#ဆောက်လုပ်ရေး #သံဈေး #အိမ်ဒီဇိုင်း

မာရဇ္ဇ Legend 🫡 Jan 23, 2025 #မာရဇ္ဇ
24/01/2025

မာရဇ္ဇ Legend 🫡 Jan 23, 2025

#မာရဇ္ဇ

မာရဇ်ဇ Legend 🫡 Jan 23, 2025

#မာရဇ္ဇ

Dec 13, 2024 // သံဈေး♦️HRB 400 Local10mm 5kg (4JY)- (2,220,000) MMK12mm 6.1kg (4FG/4JY)- (1,950,000) MMK16mm 13kg (4JY/4...
13/12/2024

Dec 13, 2024 // သံဈေး
♦️HRB 400 Local
10mm 5kg (4JY)- (2,220,000) MMK
12mm 6.1kg (4FG/4JY)- (1,950,000) MMK
16mm 13kg (4JY/4FG)- (2,230,000) MMK
18mm 17kg (4JY/4FG)- (2,500,000) MMK
20mm 20kg (4FG/4jy)- (2,350,000) MMK

♦️HRB 400 Exp
10mm 5kg(5M)- (2,550,000) MMK
10mm 5.5kg(5M)- (3,250,000) MMK
12mm 7kg(/UIS/5M)- (2,240,000) MMK
16mm 14kg(4 1300jy)- (2,620,000) MMK
16mm 13kg(RKS)- (2,450,000) MMK
18mm 18.5kg(Rouhina)- (2,700,000) MMK
20mm 22kg (41300jy)- (2,620,000) MMK

🔴HRB 500 Local
10mm 5FXGT(7.3kg)- (3,650,000) MMK
12mm 5FXGT(10.4kg)- (3,320,000) MMK
16mm 5FXGT(18.96kg)- (3,500,000) MMK
18mm 5FXGT(23.95kg)- (3,550,000) MMK
20mm 5FXGT(28.96kg)- (3,450,000) MMK

🔴HRB 500 Exp
10mm AS(7.3kg)- (4,100,000) MMK
12mm AS(10.4kg)- (3,900,000) MMK
16mm AS(18.96kg)- (4,070,000) MMK
18mm AS(23.95kg)- (4,100,000) MMK
20mm AS(28.6kg)- (4,100,000) MMK

✅6.5mm coil 1ton- (4,430,000) MMK
✅8mm coil 1ton- (4,380,000) MMK
✅18G နန်းကြိုး 1ခွေ- (130,000) MMK

(အပြောင်းအလွဲ ရှိနိုင်သည်)
𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻
☎️Phone🔵Viber: 09 - 958 758 758

#သံဈေး #ဆောက်လုပ်ရေး #အိမ်ဒီဇိုင်း

Here are the unit weights of reinforced concrete, steel, and water in the FPS (foot-pound-second) system: * Reinforced C...
27/11/2024

Here are the unit weights of reinforced concrete, steel, and water in the FPS (foot-pound-second) system:
* Reinforced Concrete: 150 pounds per cubic foot (pcf)
* Steel: 490 pounds per cubic foot (pcf)
* Water: 62.4 pounds per cubic foot (pcf)

Htet Phyoe Aung (BE-Civil)
𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻
☎️Phone🔵Viber: 09 - 958 758 758

သံဈေးပြန်ကျလာSep 10, 2024 / ဈေးနှုန်း Update-HRB 400 Local//10mm 5kg (4JY)=2,350,000 MMK12mm 6.1kg (4FG/4JY)-2,160,000 M...
10/09/2024

သံဈေးပြန်ကျလာ
Sep 10, 2024 / ဈေးနှုန်း Update

-HRB 400 Local//
10mm 5kg (4JY)=2,350,000 MMK
12mm 6.1kg (4FG/4JY)-2,160,000 MMK
16mm 12.1kg (4JY/4FG)-2,470,000 MMK
20mm 20kg (4JY)=2,540,000 MMK

-HRB 400 Exp//
10mm 5.3kg(5M) =3,370,000 MMK
10mm 5kg(5M)=3,190,000 MMK
12mm 7.2kg(/UIS/41300jy)=2,620,000 MMK
16mm 14kg(4 1300jy)-2,820,000 MMK
16mm 13kg(RKS)=2,690,000 MMK
20mm 22kg (41300jy)-2,870,000 MMK

6.5/8mm coil 1ton-4,710,000 MMK

18G နန်းကြိုး-135,000 MMK

𝗛𝗼𝗿𝗻 𝗖𝗼𝗻𝘀𝘁𝗿𝘂𝗰𝘁𝗶𝗼𝗻
☎️Phone🔵Viber: 09 - 958 758 758

#ဈေးနှုန်း #ဒီဇိုင်း #ဆောက်လုပ်ရေး

Address

123(A)x124, 59(B)
Mandalay

Alerts

Be the first to know and let us send you an email when Horn Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Horn Construction:

Share