New International Airport Nouakchott

New International Airport Nouakchott Airport in the Sahara Desert
Constructed 2011 to 2015
Built in most part through the efforts and sweat of the people of Mauritania.

The terminal in Sept.  Should be substantially complete in Nov.
17/09/2015

The terminal in Sept. Should be substantially complete in Nov.

Column form at terminal
18/05/2013

Column form at terminal

Light can installation RW 16-34
18/05/2013

Light can installation RW 16-34

Air Traffic Control Tower
18/05/2013

Air Traffic Control Tower

Windscreen to protect paving
18/05/2013

Windscreen to protect paving

Paving RW 6-24
18/05/2013

Paving RW 6-24

Terminal Floor beams in arrivals hall
17/05/2013

Terminal Floor beams in arrivals hall

Passenger terminal start of columns
17/05/2013

Passenger terminal start of columns

Freight building with floor completed
17/05/2013

Freight building with floor completed

Concrete through the paver
20/03/2013

Concrete through the paver

Truck positioned to dump
20/03/2013

Truck positioned to dump

Address

Nouakchott

Website

Alerts

Be the first to know and let us send you an email when New International Airport Nouakchott posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share