OZNI Energy LTD

OZNI Energy LTD Engineering, Procurement, Installation, Construction, Operation, Maintenance and sales.

30/07/2026

Feed bottom Exchanger

Equipments servicing
30/07/2026

Equipments servicing

30/07/2026

***Drilling Operations & Well Planning Engineering Master Class for Field Technicians & Engineers (OODE) Level 1 & Level 2: Accummulators***

The main control unit is called an accumulator. It controls all systems that interconnect to prevent emergency situations. The system activates based on hydraulic pressure, and the typical accumulator houses pumps, a hydraulic reservoir, a control manifold, control valves,
compressed gas bottles, and several other facets.

****

Note:

Chess Subsea Engineering is the ideal solution for onboarding competence training and on the job subsea operations familiarization, and a perfect start for building your subsea career internationally.

For enquiries on our range of marine, offshore, subsea & hydrodynamics engineering designs, analysis & simulations; please contact [email protected],
or watsapp us on +44 (0) 7930387345 (International) or +2348151453146 (Africa)

CS-1 Ologbo Gas pipe line project.
13/03/2026

CS-1 Ologbo Gas pipe line project.

12/03/2026
12/03/2026

Crude Oil Quality & Refining 🛢

1. 🇺🇸 United States (WTI) – 39–41° API
• Light, sweet crude
• Very easy to refine, high gasoline & jet fuel yield.

2. 🇮🇷 Iran (Iran Light) – 33–36° API
• Medium-light crude
• Iran Light sits near the medium-light range that many refineries are designed for

3. 🇷🇺 Russia (Urals) – 30–32° API
• Medium sour crude
• Requires more processing.

4. 🇻🇪 Venezuela (Merey / Orinoco) – 15–16° API
• Heavy crude
• Thick, tar-like, complex refining needed.

📌 Lets now focus on Key Insights 🌍

• Higher API Gravity = Lighter Oil = Easier Refining = Bigger Profits

• Iranian crude sits between ultra-light US shale and heavy Venezuelan oil, making it highly compatible with many global refineries.

• Strait of Hormuz carries a large share of the medium-grade crude many refineries are designed to process.

• If Hormuz supply is disrupted, refineries must switch to heavier or ultra-light substitutes, reducing efficiency and profits.

• Quality of oil often drives global oil politics more than most people realize.

12/03/2026

PRESS RELEASE

NNPC Secures Presidential Approval for $20 Billion Final Investment Decision on Bonga Deepwater Project

His Excellency, President Bola Ahmed Tinubu GCFR, has approved a targeted fiscal incentive designed to unlock the long awaited Final Investment Decision (FID) on the Bonga Southwest Aparo (BSWA) deepwater project, marking a milestone in Nigeria’s ongoing drive to attract strategic investments and accelerate sustainable economic growth. The project is estimated to attract about $20 billion in Foreign Direct Investment and position Nigeria for a new era of deepwater production.

Read the full press release when you visit https://nnpcgroup.com/insights/press-release-nnpc-secures-presidential-approval-for-20-billion-final-investment-decision-on-bonga-deepwater-project

Compressor maintenance
01/03/2026

Compressor maintenance

Address

23B Etete Road
Bénin
300102

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00

Website

Alerts

Be the first to know and let us send you an email when OZNI Energy LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category