Wit Int. Services Limited

  • Home
  • Wit Int. Services Limited
Call Contact the business

Wit Int. Services Limited Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Wit Int. Services Limited, Construction Company, Port Harcourt, .

Follow this link to join my WhatsApp group:
21/05/2026

Follow this link to join my WhatsApp group:

WhatsApp Group Invite

You may want it or someone you know may want it or someone you know that knows someone who may want it.
23/01/2026

You may want it or someone you know may want it or someone you know that knows someone who may want it.

20/01/2026

What is the benefit of a high roof?

Let's set it out for you.
10/01/2026

Let's set it out for you.

Construction of pipe sleepers foundation.These are isolated foundations.Check comment 👇
26/10/2025

Construction of pipe sleepers foundation.
These are isolated foundations.
Check comment 👇

Lagos-Calabar coastal highway costs N7.5billion per kilometer. ~Dave Umahi, Minister of Works defended the controversial...
14/10/2025

Lagos-Calabar coastal highway costs N7.5billion per kilometer.
~Dave Umahi, Minister of Works defended the controversial cost of the ongoing Lagos-Calabar Coastal Highway.

“A standard coastal road is going for N7.5billion per kilometer of standard highway, however, this N7.5 billion includes all the fillings, shore protections, solar lighting throughout, and planting of trees.”.

“The first section, 47.47 kilometers, is costing ₦1.067 trillion and is six lanes. When you divide this ₦1.067 trillion by 47.47 and by two, you will get 11.57 — a kilometer of three lanes

“A standard federal highway is two lanes. So by the time you now divide by three and multiply by two, you will see that a standard coastal road is going for ₦7.5 billion per kilometer.”

The figure covers not only the construction cost but also shoreline defenses, solar-powered street lighting, concrete retaining walls, and landscaping.

The ministry had faced challenging terrain along the route, encountering deep pits up to 20 meters which had to be excavated and refilled in stages before concrete laying could commence.

“You encounter a pit of up to 20 meters and then this pit we removed and then refilled with lumps in levels and stages and then we are passing through there now. At kilometer 32, we also have encountered such.

Comparing the coastal highway project to earlier asphalt-based road projects awarded by previous administrations, the current use of reinforced concrete makes the new road longer-lasting and more cost-effective.

“As at five years ago, the cost of one meter cubed of concrete awarded by the past administration was ₦729,000 per meter cubed.

“We started the coastal highway with ₦350,000 per meter cubed. So leave out the president or any other person, hold me accountable, ask me questions, come for debate, and I will give you the cost of one meter cubed of concrete.”

Rebound hammer test.Check comments section 👇
11/10/2025

Rebound hammer test.

Check comments section 👇

Newly Constructed Road By Soludo, Washed Away After Heavy Rain.Was the road construction done according to standards?
08/10/2025

Newly Constructed Road By Soludo, Washed Away After Heavy Rain.

Was the road construction done according to standards?

Why do we plaster the internal walls of the foundation?Is there any advantage or benefit to that?check comment section 👇
02/10/2025

Why do we plaster the internal walls of the foundation?
Is there any advantage or benefit to that?

check comment section 👇

Address

Port Harcourt

Telephone

+2349049487087

Website

Alerts

Be the first to know and let us send you an email when Wit Int. Services Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Wit Int. Services Limited:

Shortcuts

  • Want your business to be the top-listed engineering company?

Share