Ajastar Construction COY

Ajastar Construction COY Construction of roads bridges,building of houses

Electrical  and CCTV  piping installation in progress
18/06/2022

Electrical and CCTV piping installation in progress

Floor slab rebar reinforcement arrangements in progress.
15/06/2022

Floor slab rebar reinforcement arrangements in progress.

Floor Deck work still in progress
03/06/2022

Floor Deck work still in progress

Floor Beam slab 750mm by 230mm work still in progress
01/06/2022

Floor Beam slab 750mm by 230mm work still in progress

  us your project is at safe hand  Build according to Standard and Specifications  Construction teams are Registered cer...
23/05/2022

us your project is at safe hand
Build according to Standard and Specifications
Construction teams are Registered certified with professional bodies
From design stage, Analysis of structure to construction stage

29/04/2022
Thank God for the success and safety of the vault wall casting M25 concrete
28/04/2022

Thank God for the success and safety of the vault wall casting M25 concrete

Ready to receive concrete mix grade M25 ( 17m3 )
25/04/2022

Ready to receive concrete mix grade M25 ( 17m3 )

Formwork in progress
22/04/2022

Formwork in progress

Work in progress
12/04/2022

Work in progress