काठमाडौंमा अर्को नयाँ EV Charging Station Installation ⚡🇳🇵

यो site मा charger राख्ने काम मात्र भइरहेको छैन। Proper earthing, transformer setup, distribution board integration, power cable routing, protection system, charger placement, testing र commissioning सम्मका सबै step carefully plan गरेर काम अगाडि बढिरहेको छ।

एउटा reliable EV Charging Station बनाउन machine मात्र राम्रो भएर पुग्दैन। Transformer capacity, earthing resistance, cable sizing, load calculation, safety protection र सही installation equally important हुन्छन्। यीमध्ये कुनै एक step कमजोर भयो भने पछि voltage issue, overheating, frequent tripping वा charger downtime जस्ता problem आउन सक्छन्।

Raiden Energy ले EV Charger supply मात्र होइन, complete EV Charging Station setup in Nepal provide गर्छ — site survey देखि transformer guideline, DB panel, earthing, installation, testing, commissioning र after-sales technical support सम्म।

काठमाडौंसहित नेपालभर safe, reliable र long-term EV charging infrastructure build गर्ने हाम्रो काम निरन्तर अगाडि बढिरहेको छ।

📍 Kathmandu, Nepal
⚡ DC Fast Charging Station
🔌 CCS2 & GBT EV Charger
🏗️ Transformer, Earthing & DB Setup
🛠️ Installation, Testing & Technical Support

RAIDEN ENERGY Complete EV Charging Station Solution in Nepal.

04/07/2026

EV Charger मा समस्या आयो भने supplier कत्तिको साथ दिन्छ? यही नै असली test हो ⚡

यो site मा third-party installation र loose connection को कारणले overvoltage/sparking issue आयो, जसले गर्दा wire burn भयो र charger मा पनि problem देखियो। Inspection गरेपछि customer लाई तुरुन्त support चाहिएको थियो — र हाम्रो team ले 24 hours भित्रै new charger replace गरेर site फेरि running condition मा ल्यायो।

पुरानो charger पनि हामीले take back गरेर required component replace गर्‍यौं, test गर्‍यौं, र अहिले हाम्रो own site मा normally working छ।

यही हो real after-support.
Machine बेचेर भाग्ने होइन — problem आउँदा site मा पुग्ने, issue identify गर्ने, customer लाई clear explanation दिने, अनि solution निकाल्ने।

EV Charging Station business मा charger मात्र होइन, proper installation, tight connection, earthing, transformer voltage, distribution board, cable sizing र after-sales support सबै कुरा equally important हुन्छ।

Raiden Energy मा हामी EV Charger import मात्र गर्दैनौं — complete EV Charging Station setup, installation guideline, technical inspection, maintenance support र 24-hour response commitment साथ काम गर्छौं।

Trust बेचेर होइन, support दिएर बनाइन्छ। 🔋🚗🇳🇵

RAIDEN ENERGY — strong after-sales support for EV Chargers in Nepal.

27/06/2026

EV Charging Station खोल्ने सोच्दै हुनुहुन्छ? ⚡🇳🇵
पहिला Transformer को कुरा बुझ्नु धेरै जरूरी छ।

धेरै मानिसले EV Charger मात्र किन्दा पुग्छ भन्ने सोच्नुहुन्छ, तर actual charging station setup मा transformer, distribution board, earthing, cable sizing, protection system, installation, testing र commissioning सबै step important हुन्छ।

Especially DC Fast Charger चलाउन proper transformer capacity मिलेन भने voltage drop, charger trip, slow charging, overheating र long-term maintenance issue आउन सक्छ। त्यसैले charging station business सुरु गर्नु अघि site survey, load calculation र transformer planning सही हुनु पर्छ।

Raiden Energy ले EV Charger import मात्र होइन, complete EV Charging Station setup package provide गर्छ — charger selection, transformer guideline, DB board, earthing, installation, technical support र business guidance सहित।

Nepal मा EV charging business को future strong छ, तर setup सही भयो भने मात्र investment safe र reliable हुन्छ।
RAIDEN ENERGY — Complete EV Charging Station Solution in Nepal.

20/06/2026

EV Charger चलाउन charger मात्र भएर पुग्दैन ⚡

Behind every reliable EV Charging Station, एउटा properly designed Distribution Board पनि त्यत्तिकै important हुन्छ। आजको video मा हामी EV Charger को लागि specially integrated distribution board देखाउँदैछौं — जहाँ protection, power control, safety र future maintenance सबै कुरा ध्यानमा राखेर setup गरिएको छ।

Nepal जस्तो voltage fluctuation र power issue हुने ठाउँमा EV Charger को distribution board अझै strong र well-planned हुनुपर्छ। Proper MCCB, contactor, surge protection, earthing connection, cable management र load handling मिल्यो भने charger long-term मा safe र reliable चल्छ।

यो board EV charging station, fleet charging, highway charging hub र commercial EV charger setup को लागि suitable हुने गरी तयार गरिएको हो। 🔋🚗

EV Charging Station बनाउँदा machine मात्र होइन, complete electrical system सही हुनुपर्छ।

RAIDEN ENERGY — building reliable EV charging infrastructure in Nepal

13/06/2026

नयाँ EV Charging Station को काम धमाधम अगाडि बढ्दैछ ⚡🇳🇵

Site मा अहिले earthing work, transformer setup, EV charger install, power cable work र safety preparation हरू भइरहेको छ। Charging station बनाउनु भनेको charger मात्र राख्नु होइन — proper transformer, earthing, protection system, cabling, testing र commissioning सबै step मिलेर मात्र सुरक्षित र reliable EV charging station तयार हुन्छ।

Nepal मा EV को growth संगै highway र local routes मा fast charging infrastructure को demand पनि बढ्दै गएको छ। हामी Kavre बाट पनि clean mobility र EV future लाई अझ strong बनाउँदै छौं। 🔋🚗

📍 Kavre, Nepal
⚡ DC Fast Charging Station
🔌 CCS2 / GBT EV Charger Setup
🏗️ Transformer + Earthing Work
🔋 Building EV Charging Infrastructure in Nepal

RAIDEN ENERGY — powering Nepal’s EV future.

06/06/2026

Another EV Charging Station Project successfully completed🇳🇵

आज हाम्रो टिमले नयाँ EV Charging Station साइटमा Transformer Installation, Earthing System, Charger Placement, Power Distribution Setup लगायतका महत्वपूर्ण कामहरू सम्पन्न गर्दैछ।

From site survey to transformer setup, earthing, charger installation, testing, and commissioning — every step matters for a safe and reliable EV charging station. 🔋🚗

Nepal’s EV infrastructure is growing rapidly, and we’re proud to be building the future of clean transportation.
One of the best ev charging station suppliers in Nepal raiden energy.
📍 New Site Under Development
⚡ DC Fast Charging
🔌 CCS2 & GBT Chargers
🏗️ Transformer Installation
One of the best EV charging station suppliers in Nepal raiden energy

30/05/2026

Full Video: नेपालमा EV Charging Station खोल्न कति investment लाग्छ? ⚡🚗

धेरैले EV charging station business सुरु गर्दा पहिलो प्रश्न यही सोध्नुहुन्छ —
“Charger को price कति हो?”

तर reality मा EV charging station को investment भनेको charger price मात्र होइन ❌
पूरा project cost बुझ्नुपर्छ, नत्र पछि budget miss हुन्छ र planning बिग्रिन सक्छ।

नेपालमा EV charging station setup गर्दा main investment यी ठाउँमा जान्छ 👇

1️⃣ DC Fast Charger
यो project को सबैभन्दा ठूलो investment हो।
40kW, 60kW, 80kW, 120kW, 180kW जति higher power charger भयो, त्यति cost पनि बढ्छ।
DC fast charger नै customer लाई fast charging service दिने main machine हो।

2️⃣ Transformer
EV charger high power load हो, त्यसैले proper transformer capacity चाहिन्छ।
NEA coordination, load approval, transformer size, site capacity planning — यी सबै कुरा सुरुमै clear गर्नुपर्छ।
Charger छ तर transformer capacity मिलेन भने business smoothly चल्दैन।

3️⃣ Distribution Board / Control Panel
Transformer बाट charger मा power safely distribute गर्न proper control panel चाहिन्छ।
यसमा MCCB, ACB, busbar, protection system, metering, outgoing breaker, earthing connection जस्ता important parts हुन्छन्।
Nepal जस्तो unstable grid भएको ठाउँमा strong distribution board धेरै जरूरी हुन्छ।

4️⃣ Power Cable
Cable भनेको सामान्य wire होइन।
EV charger मा high current flow हुन्छ, त्यसैले charger capacity र distance अनुसार सही copper/aluminium power cable select गर्नुपर्छ।
गलत cable size राखियो भने voltage drop, heating, tripping र safety problem आउन सक्छ।

5️⃣ Earthing & Protection System
EV charging station मा safety सबैभन्दा important हुन्छ।
Proper earthing, MCCB protection, surge protection, overload protection, short circuit protection र grounding system राम्रो हुनुपर्छ।
यो part मा compromise गर्नु भनेको future risk बढाउनु हो।

6️⃣ Installation Materials & Tools
Cable shoes, lugs, gland, heat shrink, cable tray, pipe, nut-bolt, crimping, testing tools, foundation work — यी साना-साना देखिने parts पनि real cost मा add हुन्छन्।
Installation quality राम्रो भएन भने charger राम्रो भएर पनि site मा problem आउन सक्छ।

7️⃣ Civil Work & Site Setup
Charger foundation, parking layout, shed, signage, lighting, cabin, transformer area, cable trenching, safety marking — यी सबैले charging station लाई professional र customer-friendly बनाउँछ।

📊 त्यसैले EV charging station investment calculate गर्दा केवल charger price हेरेर decision लिनु हुँदैन।

Real investment includes:
✔ DC Fast Charger
✔ Transformer
✔ Distribution Board
✔ Power Cable
✔ Earthing System
✔ MCCB / ACB Protection
✔ Installation Accessories
✔ Civil Work
✔ NEA Coordination
✔ Testing & Commissioning
✔ After-Sales Support

💡 Wrong planning = future headache
💡 Right planning = safety + uptime + better ROI

नेपालमा EV charging station business बढ्दैछ, तर यो business मा entry गर्नु अघि proper technical planning, site evaluation, electrical design र total investment structure बुझ्न धेरै जरूरी छ।

At RAIDEΝ ENERGY, हामी EV charger supply मात्र गर्दैनौं — हामी site planning, charger selection, transformer coordination, cabling, distribution board, installation, commissioning र after-sales support सम्म complete EV charging solution दिन्छौं।

नेपालमा EV Charging Station खोल्ने सोच्दै हुनुहुन्छ भने पहिले पूरा investment structure बुझ्नुहोस्, अनि मात्र smart decision लिनुहोस्। ⚡🚗
⚡️

22/05/2026

Part 2 : EV Charging Station Investment —

Part 1 मा हामीले कुरा गर्‍यौं:
👉 1. DC Fast Charger
👉 2. Transformer
अब धेरैले ignore गर्ने तर real site मा पैसा लाग्ने important parts.

👉 3. Distribution Board / Control Panel Board:
EV charger सिधै transformer बाट चलाउने कुरा होइन।Proper Distribution Board चाहिन्छ, जहाँबाट power safely control हुन्छ। यसमा usually हुन्छ:
✔ Main MCCB / ACB
✔ Protection system
✔ Metering system
✔ Busbar
✔ Proper earthing connection
✔ Overload / short circuit safety

Distribution Board राम्रो नभए charger जति राम्रो भए पनि site मा problem आउन सक्छ।Especially Nepal जस्तो unstable grid भएको ठाउँमा control board strong हुनु धेरै जरूरी छ।

👉 4. Power Cable:
EV charger मा cable भनेको सामान्य wire होइन।High power load carry गर्ने proper size power cable चाहिन्छ।
Cable size depend गर्छ:
✔ Charger capacity — 40kW, 60kW, 80kW, 120kW
✔ Transformer देखि charger सम्म distance
✔ Copper or aluminium cable
✔ Voltage drop
✔ Future expansion plan

गलत cable size राखियो भने:
❌ Voltage drop हुन्छ
❌ Cable heat हुन्छ
❌ MCCB trip हुन्छ
❌ Charger performance घट्छ
❌ Safety risk बढ्छ
त्यसैले EV charging station बनाउँदा cable calculation properly गर्नैपर्छ।

👉 5. Cable Shoes, Lugs & Installation Materials
धेरैले यो part लाई सानो खर्च ठान्छन्, तर installation quality यहीँबाट देखिन्छ।
Proper installation मा चाहिने materials:
✔ Cable shoes / lugs
✔ Gland
✔ Heat shrink
✔ Earthing strip / cable
✔ Cable tray / pipe
✔ Nut-bolt, washer
✔ Ferrule, marker, ties
✔ Crimping tools
✔ Earthing accessories

21/05/2026

Yatayat Election

01/05/2026

Let’s break the REAL investment structure — no confusion, only clarity.

👉 1. DC Fast Charger (सबैभन्दा ठूलो खर्च)
यो नै main machine हो — fast charging, high power, high cost.
Your biggest investment goes here.

👉 2. Transformer (दोस्रो ठूलो खर्च)
Without proper transformer, charger चल्दैन।
NEA coordination + capacity planning = must.

📊 Many people only think “charger price” = total cost ❌
But actual project cost includes:
✔ Charger
✔ Transformer
✔ Installation & cabling
✔ Protection system (MCCB, earthing, etc.)

💡 सही planning नगरे investment risk हुन्छ
💡 सही setup गरे — strong ROI + long-term busines ⚡️

Address

Lalitpur

Alerts

Be the first to know and let us send you an email when Raiden Energy posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category