Middle Tamor Hydropower 75 mw

Middle Tamor Hydropower 75 mw मध्य तमोर जलबिद्युत आयोजना 75 mw

Middle Tamor Hydropower Project (75 MW)

General features of Middle Tamor Hydropower project are presented below

General


Installed capacity
75 MW (as per license granted by DoED)

Project Location :

Taplejung district



Linkhim/Khejenim/Hadewa/Sawadin and Phurambu VDCs,

Zone :

Mechi Zone

Development region :

Eastern Development Region

Nearest highway :

Mechi Highway

Nearest Roadhe

ad

Phunglin Bazaar, Taplejung

Climate :

Sub-tropical, Temperate & Alpine

Average temperature:

Maximum : 18° in April



Minimum : -0.3° in February

PROJECT LOCATIONS


Boundary Points
Locations

Longitude

Latitude

1

87° 40’ 18” E

27° 27’ 09” N

2

87° 40’ 18” E

27° 23’ 57” N

3

87° 42’ 40” E

27° 27’ 09” N

4

87° 42’ 40” E

27° 23’ 27” N



HYDROLOGY


Catchment Area
1850 km2 (at UTHP proposed intake)

2078 km2 (at MTHP headworks location)


Annual mean flow

107.7 m3/s

Maximum discharge

3770 m3/s (11 August 1987, 6760 m3/s at Gauging station 690, Mulghat)

Minimum discharge

8.09 m3/s (17 March 1965, 26 m3/s at Gauging station 690, Mulghat)

Design discharge
105 m3/s (34.5% Exceedence flow at UTHP proposed intake)

Project Components

Inverted siphon 5m wide,5 m high,127 m long ,2 chambered

Headrace Canal Trapezoidal reinforced concrete canal,85 m long

Headrace pond Type: Surface , Average area:5044 m2, Average Height: 7.15m

Headrace Tunnel 2905.97 m

Surge Tank 36.63m height , 25m diameter

Penstock pipe 5.25 m internal, Thickness:12-40mm

Power House Semi surface

Source:
http://www.sanimahydro.com.np/ongoingpro.php?id=31

Address

Asia
Taplejung
57500

Website

Alerts

Be the first to know and let us send you an email when Middle Tamor Hydropower 75 mw posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category