  ROAD APPARTMENTS With the last floor poured we are ready for the top level!!! This whole top level is all timber. Can’...
05/06/2024

ROAD APPARTMENTS
With the last floor poured we are ready for the top level!!! This whole top level is all timber. Can’t wait to get stuck into all this wood work. Especially this massive roof!!!

 -New master bedroom/ensuite and walk in wardrobe.Frammed✔️roof on ✔️windows in ✔️and cladded 🤙 time for a preline so we...
28/05/2024

-New master bedroom/ensuite and walk in wardrobe.
Frammed✔️roof on ✔️windows in ✔️and cladded 🤙 time for a preline so we can get some@gib on and start finishing this little beauty off. Stay tuned

 .💥ROOFSHOUT, time to cladd this beautiful wee thing.Windows are in and we are good to gooooooooo
20/05/2024

.
💥ROOFSHOUT, time to cladd this beautiful wee thing.
Windows are in and we are good to gooooooooo

  TERRACES.Midfloor progress. Probably the last of the traditional subfloor builds. We will be moving forward with casst...
20/05/2024

TERRACES.
Midfloor progress. Probably the last of the traditional subfloor builds. We will be moving forward with casstte floors with this developer to speed things up even more. We look at everything to make things faster and more efficient all the time. Next build allready under way with timber cassette floors in the design 👍👀👀👀👀👀👀

  SMALL BUILD-Slab poured, frames delivered and stood, trusses installed and all wrapped up within a few weeks. As we wa...
06/05/2024

SMALL BUILD-
Slab poured, frames delivered and stood, trusses installed and all wrapped up within a few weeks. As we wait for roof and windows to arrive we setout battens and make a start on the cladding .Working out window heights and spacing so we can smash it once we install the windows 🫡👌👌👊👊👊

KIVELTERRACES #                                                                                                   4x2 be...
01/05/2024

KIVELTERRACES # 4x2 bedrooms 2x3 bedroom
With the bolts and bracing anchors installed first to the mm 👌we installed the portals first and then ground floor frames. Worked out perfect. Time for the mid floor 🔨🔨🔨🔨🔨🔨

 Another development 🙌 steel in first bolted down to our preset ignoring brackets which turned out perfect! 👌.Four two b...
06/03/2024


Another development 🙌 steel in first bolted down to our preset ignoring brackets which turned out perfect! 👌.Four two bedrooms and two 3 bedroom units coming up. This was completed end of last year , so tunes for some of the Awsome work the boys have done.

  - New addition / New kitchen, main bathroom, new flooring through out all new double glazed windows. Full interior/ pa...
06/03/2024

- New addition / New kitchen, main bathroom, new flooring through out all new double glazed windows. Full interior/ paint the works.

SMALL NEW BUILD - Extensive foundation work for this week fellah.Because of the developments over flow heights and peat ...
06/02/2024

SMALL NEW BUILD - Extensive foundation work for this week fellah.
Because of the developments over flow heights and peat soil we have had to beef this foundation up.
With this thing needing to be sitting out of the ground by round 1m we have had to add in some high density Polyrock 500mm thick! With a topping off 300 of some compacted gap. There was also ground beams put through this slab to help with weight distribution. All in all went very smooth. The poly rock saved tons of time / metal /engineer inspections

  BUNGALOW ENTRY 🔥——————> swipe                                                                 This beautiful bungalow ...
23/01/2024

BUNGALOW ENTRY 🔥——————> swipe
This beautiful bungalow got the entryway it deserved!! Stay tuned for the rest of the glam up this beauty got

  3 Story appartments.Blockies up first with the intertenancy/fire walls before the steel structure gets fitted in betwe...
08/12/2023

3 Story appartments.
Blockies up first with the intertenancy/fire walls before the steel structure gets fitted in between. This thing will go up fast ⚡️⚡️this has another 2 concrete floors to go. Concrete floors are a lot easier when you dealing with upper level tenancy’s not only with fire but with noise. Have you seen what you need to do if it’s a timber floor?? 🥴🥴. We build smarter 😉

 -DEVELOPMENT.Our Completed 13 terraced units.This was completed shortly after Covid and have now completed 2 seperate b...
08/12/2023

-DEVELOPMENT.
Our Completed 13 terraced units.This was completed shortly after Covid and have now completed 2 seperate blocks of 7 and are now on to a 15 unit 3 story appartment! We do big stuff!! And where good at it 😉

Address

Auckland
Auckland
1025

Alerts

Be the first to know and let us send you an email when JD Buildgroup LTD posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JD Buildgroup LTD:

Share