WNB Design & Engineering Services

WNB Design & Engineering Services Design, Engineering, & Construction OWNER INFORMATION/ BIOGRAPHY

WALTER N. BROSAS
#86 Sampaguita Street, Brgy. LTD. Designer/Engr. RAMUNIA FABRICATOR Sdn. Bhd.

Daniw Liliw, Laguna, 4004 Philippines Email: [email protected] Hand phone: +639777852894


EDUCATION
Far Eastern University, Manila, Philippines
Year 1990 - 1997
Bachelor of Science in Architecture with Basic Electrical Engineering
Certification in AutoCAD- Year 1996- Metro Data Compu

ter College,
Manila Philippines

BRIEF INTRODUCTION
Over 10 years of experience in Design/ Engineering, Detailing, & Construction in Oil & Gas Industry and Private/ Commercial Building, with Offshore Platform Fabrication site experience and competent in Architectural Design with estimation. With knowledge in various design and detailing softwares, Autocad 2D/ 3D (BIM), Autodesk Revit, PDMS- Plant design management system and Microsoft office program. WORK EXPERIENCES

WNB DESIGN & ENGINEERING SERVICES
Liliw, Laguna, Philippines
July 2017 – Pressent
Project Manager/ Owner

MALAYSIA MARINE & HEAVY ENGINEERING
Pasir Gudang, Johor, Malaysia
April 2013 – April 2016 (3years & 1 month)
Executive Electrical Engineer

OAKWELL SHIPBUILDING ENGINEERING & CONST. Chonburi, Thailand
August 2011 – April 2013 (1 year & 9 Months)
E & I Engineer

MALAYSIA MARINE & HEAVY ENGINEERING
Pasir Gudang, Johor, Malaysia
Feb. 2009 – Aug. 2011 (2 years & 7 months)
Elect. Bhd., Malaysia
Telok Ramunia, Pengarang Johor, Malaysia
May 2006 – Feb. 2009 (2 years & 7 months)
Electrical Designer

WNB DESIGN SERVICES (Proprietor)
Laguna, Philippines
March 2003 – Oct. 2005 (2 years & 8 months)
Project Architect/Engr. NEW BLUE FRAMEWORK CONSTRUCTION
Antipolo Rizal, Philippines
April 2002 – March 2003 (1 year )
Site Engineer/Estimator

HI-SKILL CONSTRUCTION & DEVELOPMENT CORPORATION
Banawe Quezon City,Philippines
Aug. 1999 – Feb. 2002 (2 years & 7 months)
Site Engineer/Estimator

VAZBUILT- Vazquez Building System Corp. Ortigas, Pasig, Philippines
July 1997 – Aug. 1998 (1 year & 2 months)
CAD Designer/Estimator

AMALGAMATED PROJECT MANGEMENT CORP. Makati, Philippines
April 1996 – July 1997 (1 year & 4 months)
Draftsman CAD/Estimator

Project involved in construction of;
• Residential and Commercial Building

• Tapis-R Topsides, Client: Exxon Mobil (EMEPMI)
• Malikai Topsides, Client: SSB
• Besar Wellhead Platform, Client: PCSB
• Bergading Wellhead Platform, Client: HESS

• Fugro Equator (P1004)Survey Vessel, Client: Fugro
• Fugro Brasilis (P1005) Survey Vessel, Client: Fugro
• 65m Extended Survey Vessel, Client: Damen
• 65m Split Hopper Barge (P1008/9), Client: Boskalis

• Kinabalu NAG Development Project (KNPG-B), Client:
PCSB (Petronas Carigali Sdn. Bhd.)


• F13E-SC-DR-A Topside, Client: SSB
• F13W-Polycarbonate Platform, Client: SSB
• Belumut-A-Topside & L. Quarters, Client: Newfield
• Angsi-D DevelopmentProject, Client: PCSB
• Vasai Jacket, Client: Hyundai

• SHELL PETROLEUM CORP. PHILIPPINES
Shell Retail (GAS) Station (M. Manila, Calabarzon)


SHELL PETROLEUM CORP. PHILIPPINES
• KDR-NLT Shell Station Project (Bulacan)
• KDR-SLT Shell Station Project (Muntinlupa)
• BULK Filling Station Project, Shell Pasacao Depot


Project involved in construction of;
• JAKA PROJECT (MASS HOUSING)
• DMCI PROJECT (MASS HOUSING)
• AYALA PROJECT (MASS HOUSING)
• FIL-INVEST PROJECT (MASS HOUSING)



Project involved in construction of;
• THREE STOREY WAREHOUSE
• KALAYAAN CENTER
• 12 STOREY HOSPITAL BUILDING
• ANTEL BUILDING

DUTIES AND RESPONSIBILITIES

FOR ARCHITECTURAL / ELECTRICAL DESIGNER/ E&I ENGINEERS

• Review engineering documents- Design Specification, Overall Block Diagram, Single line, Schematic/ Wiring Diagram, Reticulation, Layout and check for compliance to applicable standard.
• Prepare technical query to consultant and client for any discrepancy / clarification found.
• Review of material specification, prepare MTO and purchase as per Contract and Specification compliance to applicable standard.
• Provide TBE (Technical Bid Evaluation) of material/equipment based in vessel specification and applicable standard prior for client/owner approval.
• Provide estimate on number of drawings to be provided, monitor and control as assigned.
• Provide shop/ fabrication (detailed) drawings prior for installation and fabrication through checking in PDMS and Autocad program.
• Perform inter-disciplinary checking IDC based from latest drawings and VDI.
• Provide termination drawings and revise engineering drawings based on final vendor data and site rectification.
• Provide assistance to production team for any inquiry and technical clarification arises at SITE.
• Provide As-built drawings. RELEVANT COURSEWORKS & TRAININGS:

• HSE- Health Safety & Environment Pilipinas Shell Petroleum Corporation
Holiday-Inn Mimosa Park Clark Airbase San Fernando, Pampanga Philippines November 14-17, 1999

• First Aid Training & Basic Life Support Training
The Philippines National Red Cross
Pilipinas Shell Petroleum Corporation Shelter Academy, Tunasan Muntinlupa, Philippines December 14&16, 1999

• Scaffolding Seminar SPI-Clubhouse Shell Pandacan Installation
Manila, Philippines
October 10, 2002

• PDMS (PML-1 &2) Ramunia Fabricator Sdn. Telok Ramunia Yard, Pengerang Johor Malaysia Nov 24 – Dec. 05,2008

Propose Elevated Residential BungalowThank you Lord Jesus for the blessing and guidance.Thank you to the owner for trust...
07/11/2025

Propose Elevated Residential Bungalow
Thank you Lord Jesus for the blessing and guidance.
Thank you to the owner for trusting our company and fast approval of design proposal.
We see to it that your dream house built with quality and according to your needs and requirement
Regards and god bless to all.

Project Design Proposal for 2-Storey Residential Building. 1) Site Location, size/ dimension and condition.2) Proper Bui...
24/10/2025

Project Design Proposal for 2-Storey Residential Building.
1) Site Location, size/ dimension and condition.
2) Proper Building Orientation.
3) Design concept and client requirement.
4) Partial Design, Space allocation and Orientation.
5) Partial client presentation and follow comments and revision.
6) Design revision until its fully compliance to owner requirements.
7) Presentation to owner for another review and comments.
8) Revision and final design proposal.
9) After that, to follow final design approved by owner.
10) Finally the Final Design Proposal.
11) Initial BOQ and Cost of project.
11) Design working drawings, Architectural, Civil/ Structural, Plumbing, ELectrical, and Structural and Electrical Analysis....
12) Finalization of BOQ and cost estimate.
13) Approval to owner.
14) Building Permit.
15) CONSTRUCTION.
16) So on on so forth... wheeww..

Thank you Lord for your help and guidance.
Thanks to my new project designer for your patience and perseverance and to the software we used.
God bless to everyone..

For inquiry, kindly contact or message us.

2019 Design project. Re-design, Extension and Roofing Installation.Thank you Lord Jesus for your grace and blessing.God ...
16/07/2025

2019 Design project.
Re-design, Extension and Roofing Installation.
Thank you Lord Jesus for your grace and blessing.
God bless and take care everyone.

SND Project Turnover: May 2025Slide n Dive Balite, Victoria LagunaThank you Lord Jesus for your guidance.Thanks to the o...
16/07/2025

SND Project Turnover: May 2025
Slide n Dive Balite, Victoria Laguna
Thank you Lord Jesus for your guidance.
Thanks to the owner to the support and trusting our company.
Thanks to my co-workers for the job well done and teamwork.
To our family whose always supporting us, thank you..
God Bless to all and take care everyone..

Project Update: 2-Storey residential Building (Banca2 Victoria Laguna)Turnover last January 2025Thank you Lord Jesus for...
26/04/2025

Project Update: 2-Storey residential Building (Banca2 Victoria Laguna)
Turnover last January 2025

Thank you Lord Jesus for giving this project and accomplished it with your will and guidance.

Thanks to the owner for trusting us and the company.
Your support and professionalism is very much appreciated.
Thanks and hopefully next time with your new idea and new project again.
Thank you and God bless you and your family.

To my team, thank you very much for your support and teamwork.
God Bless to all and keep safe..

Project Update: Maceda Project(Late Upload and update) 3 Storey Commercial Building had been turnover last december 2024...
26/04/2025

Project Update: Maceda Project
(Late Upload and update) 3 Storey Commercial Building had been turnover last december 2024.

First, I would like to thank our Lord Jesus for the guidance and strenght gave to passed all difficulties and trials to this project. We declared to you and in your will. Thak you very much.

Second, Thanks to the owner for trusting and support for our company. Even though some problem occurs before and during constructions, your understanding is always presence. thank you very much is not enough.

Third, to my fellow workers, thank you very much for your cooperation, support and teamwork. We cannot finished this project without you all.

Lastly, to my family and friends.. thank you very much..

God Bless to all and keep safe every one.

Quezon City Project:North susana height old balara.The project is done and turnover.Thank you, lord Jesus, for your help...
23/06/2024

Quezon City Project:
North susana height old balara.
The project is done and turnover.
Thank you, lord Jesus, for your help and guidance.
Thanks to the owner for the support and trust in our company. We really appreciate your happiness in the outcome of the project. Thanks again.
For the team, thank you very much for the support and teamwork. God bless to all and more blessings to come.

Cavite project update: ALmost done.Thank you lord jesus for you guidance.Thanks to the owner for your trust and support....
24/02/2024

Cavite project update: ALmost done.
Thank you lord jesus for you guidance.
Thanks to the owner for your trust and support.
Thanks to the team for all the effort and teamwork.
God bless us all and keep safe everyone.

SC Project Update:Turnover of SCSLAi Office. Thank you Lord Jesus for your guidance and help.Thanks also to the client f...
30/12/2023

SC Project Update:
Turnover of SCSLAi Office.
Thank you Lord Jesus for your guidance and help.
Thanks also to the client for your support and understanding.
And thanks to our fellow workers for your works and full effort to finished our project.
Thank you very much to all and god bless.
Happy holiday.

Address

Liliw

Website

Alerts

Be the first to know and let us send you an email when WNB Design & Engineering Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to WNB Design & Engineering Services:

Shortcuts

Share