Directorate of works University of Buner

Directorate of works University of Buner In today’s world, only those people who are passionate about excelling in their fields can earn respectable lifestyles.

We are proud to employ the best engineering services at the University of Buner with impressive credentials, experience, and broad vision, and we are accomplishing promising results. The Main Campus, University of Buner, is under construction at Swari, Buner. The land for Main Campus and Approach Road is comprised of about 87 kanal. The University of Buner is an umbrella project that is funded by

both the Higher Education Commission (HEC) and the Higher Education Department (HED). The total cost of the project is PKR 1861.92 million. We, the Directorate of Works, are performing engineering services, i.e., feasibility studies, preparation of proposals for new projects, tendering of new projects, monitoring of project activities, execution of projects, maintenance and repair works, and suggestions to the competent authority regarding construction works. Further, this office also facilitates the university in the inspection of all newly purchased items, different documentation works, the preparation of TORs for different relevant committees, the verification of invoices from different suppliers and contractors, and the provision and preparation of specifications, designs, drawings, and estimates for new and repair works. This office executed construction activities according to drawings, designs, technical standards, laid-down procedures, and laws. Further, this office will ensure quality and quantity and reduce audit observation to the maximum possible limit. We, the Directorate of Works, are performing different types of jobs related to technical matters and urgent responses. The university is dealing with huge numbers of students, faculty, and administration staff, which needs immediate attention for providing basic amenities, repairs, and maintenance work for the smooth operation of the university's activities. We, the Directorate of Works, will have the responsibility to insure quality work, which will not only reduce cost of maintenance but will also provide iconic buildings and infrastructure to the University. Keeping in view location of the University regarding greenery and pleasant weather. Directorate of Works also planning to arrange different trainings related to construction industry. This will not only improve knowledge of the Engineers but will also earn some money for the University. Training will be conducted by the Directorate of Works staff and a resource person from outside of the university if needed. I wish with great success and am confident that our University of Buner will become a model in respect of Quality Education, Attractive Location and Class Construction in coming years, Inshallah. ONGOING PROJECTS

Construction of Academic Block-C for 1500 Students

Three-story building with total 68,000-square-foot floor area
24 Class rooms, 4 lecture halls, theatre type
Faculty & administration offices
Computer Labs, sciences labs and a general library
Equipped with 2 numbers of lift elevators
total estimated cost is 154 million
Completion period: June 2022
-Construction of Academic Block-A for 4000 Students

Six-story building with basement and total 180,000 square feet of floor area
60 class rooms, 4 lecture halls, theatre type
Faculty & Administration offices
Computer lab, sciences lab & departmental library on each floor
Lift elevators for students and staff
total estimated cost is PHP 989 Million
Completion period: March 2024
INCOMING PROJECTS
The tendering and bidding processes for the following projects have been completed:

-Construction of Administration Block

-Construction of Faculty & Staff Hostel

-Construction of Girls Hostel

EXISTING Blocks: REPAIR & Maintenance WORKS
Routine repair, maintenance, and installation are continuing based on departments’ requirements, needs-based work, and emergency works. The current facility consists of the following components:

One Academic Block
Staff/faculty Hostel
Boys Hostel cm Admin Block
Girls Hostel

31/07/2026
Campus Development Committee meeting.
28/07/2026

Campus Development Committee meeting.

Next Milestone: Solarisation Insha Allah; under the visionary leadership of the Vice Chancellor University of Buner. 🩵
08/07/2026

Next Milestone: Solarisation Insha Allah; under the visionary leadership of the Vice Chancellor University of Buner. 🩵

07/07/2026

The University of Buner, in collaboration with the Project Implementation Unit (PIU), UET Peshawar under the KP Rural Economic Transformation Project (KP-RETP), invites applications for a Six (06) Days Skill-Based Training Program on Kitchen Gardening (Vegetables & Fruits Farming) to be conducted at District Buner.

Program Features:
Practical, competency-based training
Modern kitchen gardening techniques
Vegetables and fruits production for household and income generation
Hands-on field-oriented sessions

Program Details:
Duration: 06 Days
Venue: University of Buner
Training Cost: Free of Cost

Benefits for Participants:
Official Training Certificate upon successful completion

Recommendation to KP-TEVTA for:
Seed Money up to PKR 73,000 (subject to approved business plan), OR
Six (06) Months Paid Internship with a monthly stipend of PKR 15,000
Opportunity to enhance self-employment and livelihood skills

Eligibility (As per Project Criteria):
Valid domicile of Khyber Pakhtunkhwa
Must meet financial eligibility criteria defined by the program

How to Apply:

Interested candidates must apply online through the official portal:
https://portal.skillskp.org/register
Date Extended.

Applications will be processed on a first-come, first-served basis.

Those who have applied are required to submit a hard copy of the form to the Director QEC Office, University of Buner.

For Information:

📞 0315-7077742
Adnan khan
Assistant Director QEC
University Of Buner

Works & Projects Status: Final meeting with SE, XeN and their staff from Pesco before energisation of Independent Feeder...
24/06/2026

Works & Projects Status: Final meeting with SE, XeN and their staff from Pesco before energisation of Independent Feeder Line at University of Buner.

Status updates: The wait was long but it paid off. Independent feeder line works are 95% completed. Energisation soon…. ...
14/06/2026

Status updates: The wait was long but it paid off. Independent feeder line works are 95% completed. Energisation soon…. Insha Allah.

Tender opening meeting.
14/04/2026

Tender opening meeting.

Projects briefing at University of Buner.
03/02/2026

Projects briefing at University of Buner.

27/01/2026

The Administration Block at University of Buner.

19/12/2025

PSDP Projects at University of Buner: The Director M&E HEC is visiting the projects at UoB.

Directorate of Works UoB

Address

Swari, Buner
Khyber Pakhtunkhwa
19290

Opening Hours

Monday 09:00 - 16:00
Tuesday 09:00 - 16:00
Wednesday 09:00 - 16:00
Thursday 09:00 - 16:00
Friday 09:00 - 16:00

Alerts

Be the first to know and let us send you an email when Directorate of works University of Buner posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Directorate of works University of Buner:

Shortcuts

Share