09/10/2026
Another complete bathroom transformation. This project came in with a very outdated shower, just a concrete slab and the showerhead, something that had been there for years and was really worn down. We demolished everything completely, and since the client wanted a bathtub, we had to move and extend the wall seven inches to get the space we needed.
After that, we framed everything with proper protection, installed the tub, and ran new wiring for the lights. We also prepared the base for the shower area and fixtures. We installed all new plumbing, including the drain and the water line to the sink. We put in a new door, built up the wall, applied paint and texture, installed the floor and baseboard, and set the toilet with all new plumbing.
To finish it off, we installed lighting and a mirror. The result, a client who was completely satisfied with their new bathroom. At SC Construction, we transform your space, contact us for your next project.